Laserfiche WebLink
REV: 12-11-25 LR <br />FEE <br />The Consultant shall perform the Scope of Work as described in Exhibit “A” for a time and <br />materials costs of $319,820 for Tasks 1 to 4, for work performed upon direction from the <br />City. Hourly rates and lab testing rates in Table 1 are effective for the duration of the <br />Project. Costs for additional services as listed in Attachment 1 are effective through June <br />30, 2026, and subject to revision at 5% per year thereafter. <br />Table 1: Fee Breakdown <br />Title Name/Item Description Qty Unit Rate Amount <br />Primary <br />Construction <br />Inspector <br />Anthony <br />DeVries <br />Construction Inspection and <br />Testing (excl. compaction)* <br />Lead Field <br />Technician Jeffery Bick Compaction Testing <br />(subgrade, AB, & AC) <br />2,080 Hr $ <br />140 <br />$ <br />291,200 <br />Project Engineer <br />Osama El- <br />Fiky, P.E, <br />G.E. <br />Consultation, Project <br />Oversight, and Final Report 24 Hr $ <br />255 $ 6,120 <br />Project Manager Ruchil Shah <br />Meetings, Project <br />Coordination, Data <br />Compilation, & Report Prep. <br />80 Hr $ <br />225 $ 18,000 <br />Lab Test Lab Proctor <br />Test <br />Subgrade & Aggregate Base <br />Material 4 Test $ <br />395 $ 1,580 <br />Lab Test Hveem <br />Density Test Asphalt Concrete 1 Hr $ <br />360 $ 360 <br />Lab Test Compression <br />Tests <br />5 Concrete Cylinders / 100 <br />Cubic Yards (4” x 8” <br />Cylinders) <br />40 Test $ 40 $ 1,600 <br />Lab Test Compression <br />Test Non Shrink Grout Cubes 24 Test $ 40 $ 960 <br />Total:$ <br />319,820 <br />*Includes: general construction inspection; daily inspections and scheduling of materials testing; <br />reinforcing steel placement inspection; concrete/shotcrete placement inspection, sampling, and testing <br />(slump/temp); post installed anchors placement inspection and load testing (pull/torque); structural steel <br />welding inspection; non-shrink grout placement inspection, sampling, and testing. <br />Notes: <br />1. The unit rates for laboratory testing include all required laboratory technician costs, sample <br />storage and disposal charges. <br />2. Regular workday is from 7:00 am to 4:00 pm, Monday - Friday. Inspector rates are portal to portal <br />based on a 2-hour minimum/show-up. <br />Additional services, beyond those identified in Table 1, will be performed on a time and material <br />basis in accordance with the current schedule of fees and services, Attachment 1, including the <br />basis of charges contained therein. <br />ATTY/AGR.2025.323/Signet Testing Laboratories, Inc. (Page 14 of 20)