Laserfiche WebLink
AGREEMENT 00 5200-3 <br /> <br />ARTICLE 5 LIQUIDATED DAMAGES FOR UNAUTHORIZED CHANGES OF KEY <br />PERSONNEL <br /> <br />5.01 Liquidated Damage Amounts <br /> Contractor and City agree that the Key Personnel listed in Contractor’s Statement of <br />Qualifications (Document 00 4513) were a material factor in City’s assessment of <br />Contractor’s experience and the adequacy of Contactor’s supervisory personnel. <br />Accordingly, Contractor and City agree that Contractor shall not remove, reassign or make <br />changes to any of the Key Personnel without City’s prior written approval. In the event that <br />any Key Personnel leaves the Project, is reassigned and/or is removed and replaced by <br />Contractor before Project Final Completion, for any reason whatsoever, Contractor agrees <br />to pay City liquidated damages as set forth in the Agreement (Document 00 5200), unless <br />Contractor can demonstrate to City’s satisfaction that the Key Personnel were reassigned <br />and/or removed and replaced for reasons beyond Contractor’s control. <br /> <br />ARTICLE 6 CONTRACT DOCUMENTS <br /> <br />6.01 Contract Documents consist of the following documents, including all changes, Addenda, <br />and Modifications thereto: <br /> <br />Document 00 5100 Notice of Award <br />Document 00 5200 Agreement <br />Document 00 5500 Notice to Proceed <br />Document 00 6113.13 Construction Performance Bond <br />Document 00 6113.16 Construction Labor and Material Payment Bond <br />Document 00 6290 Escrow Agreement for Security Deposits <br />Document 00 6325 Substitution Request Form <br />Document 00 6530 Agreement and Release of Any and All Claims <br />Document 00 6536 Guaranty <br />Document 00 7200 General Conditions <br />Document 00 7316 Supplementary Conditions – Insurance and <br />Indemnification <br />Document 00 7319 Supplementary Conditions – Hazardous Materials <br />Document 00 7380 Apprenticeship Program <br />Document 00 9113 Addenda <br /> <br />City of Redwood City Standard Details (November 25, 2019 and latest revision) <br /> <br />[2022] California Department of Transportation Standard Specifications and any <br />revisions thereto <br /> <br />[2022] California Department of Transportation Standard Plans and any revisions <br />thereto <br /> <br />Specifications As listed in Document 00 0110 Table of Contents <br />Drawings, Table, Schedules listed in Document 00 0115 <br />Notice Inviting Bids <br />Contractor’s Bid <br />Contractor’s Submittals <br />All General Requirements as specified in Table of Contents <br />All Technical Specifications as specified in Table of Contents <br /> <br />