My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />ATTACHMENT 4—SAMPLE PROJECT PLAN <br />Dates in this Sample Project Plan are illustrative and calculated based on a hypothetical <br />NTP of January 5, 2026. Consultant will provide an actual Project Plan based on this <br />template within one (1) week of NTP. <br />Project Overview <br />Objective: Replace existing parking revenue collection devices with a new Gateless <br />PARCS system with Mobile LPR across three garages (Jefferson, Marshall, Winslow), <br />minimizing downtime through parallel installation and thorough testing. <br />Scope: <br />Install new gateless parcs solution adjacent to existing equipment in each <br />garage. <br />Run additional Cat6 data cables through existing conduits. <br />Provide power and communication to new devices without disrupting current <br />systems. <br />Perform end-to-end device acceptance testing and operational testing before <br />cutover. <br />Remove old equipment only after successful testing of the new system and sign <br />off by client <br />Key Constraints: <br />Minimize downtime to avoid revenue loss and customer inconvenience. <br />Adhere to garage-specific timelines for infrastructure, installation, and demolition. <br />Ensure compatibility with existing infrastructure (conduits, power, network). <br />Comply with safety and regulatory standards <br />Timeline (Tentative, Based on NTP: January 5, 2026) <br />Does not account for recognized holidays and City breaks. <br />Phase/Task Duration Start Date <br />(Approx.) <br />End Date <br />(Approx.) <br />Project Initiation 1 week January 12, 2026 January 19, <br />2026 <br />Software Build and Internal <br />Testing 6 weeks January 19, 2026 March 2, 2026 <br />Pre-Installation Marketing Plan 4-6 <br />weeks February 2, 2026 March 16, 2026 <br />Final Testing and Shipping 12 weeks January 12, 2026 April 6, 2026 <br />Jefferson Infrastructure 2.5 <br />weeks <br />February 23, <br />2026 March 16, 2026 <br />Marshal Infrastructure 2 weeks March 16, 2026 March 30, 2026 <br />Jefferson Installation 1.5 <br />weeks March 16, 2026 March 30, 2026 <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 134 of 167)