My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />Marshal Installation 1 week March 30, 2026 April 6, 2026 <br />Jefferson Testing and <br />Implementation <br />2-3 <br />weeks March 30, 2026 April 20, 2026 <br />Winslow Infrastructure 1.5 <br />weeks March 30, 2026 April 13, 2026 <br />Marshal Testing and <br />Implementation <br />2-3 <br />weeks April 6, 2026 April 27, 2026 <br />Winslow Installation 1 week April 13, 2026 April 20, 2026 <br />Jefferson Demolition & Cutover 2 days April 20, 2026 April 22, 2026 <br />Winslow Testing and <br />Implementation <br />2-3 <br />weeks April 20, 2026 May 11, 2026 <br />Marshal Demolition & Cutover 2 days April 27, 2026 April 29, 2026 <br />Winslow Demolition & Cutover 2 days May 11, 2026 May 13, 2026 <br />Initial Overview Training 1 week May 25, 2026 May 29, 2026 <br />30-Day Operational <br />Demonstration Testing 30 days May 25, 2026 June 23, 2026 <br />Total Project Duration: Approximately 30 weeks from NTP. <br />Execution Strategy <br />Sequential vs. Parallel: Infrastructure progresses sequentially (Jefferson → <br />Marshal → Winslow). A secondary crew handles installation at Jefferson <br />concurrently with Marshal’s infrastructure, then at Marshal with Winslow’s <br />infrastructure, optimizing resource use. <br />Downtime Mitigation: Limited to 2-day cutover per garage during low-traffic <br />hours. <br />Resource Allocation: Primary crew for infrastructure, secondary crew for <br />installation, coordinated post-shipping. <br />Key Considerations <br />Downtime limited per garage during cutover, with rollback plans. <br />Weekly stakeholder updates via EnSight calls. <br />Scalability for future upgrades. <br />Contingency with old system backups. <br />Assumptions <br />Conduits have capacity for additional Cat6 cables <br />Power supports new devices without upgrades <br />Staff are available for training <br />Two crews (infrastructure and installation) are available <br />City Responsibilities <br />Coordinate garage access and support safe working conditions for installation <br />team <br />Provide adequate internet connection and speed per specifications, no less than <br />20Mbps up and 20Mbps down <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 135 of 167)