My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />Identify and schedule Staff for training <br />Project Phases and Tasks by Garage <br />Project Initiation <br />Duration: 1 week <br />Start: 1 week after Notice to Proceed (NTP, i.e., signed contract and receipt of deposit) <br />Objective: Establish project foundation and prepare for infrastructure work. <br />Kickoff meeting scheduled. <br />Software configuration confirmed. <br />Fee structure and enforcement rules defined. <br />Pay Station/Meter locations determined. <br />Marketing Plan defined. <br />Schedule roll out and training with identified key operational team members. <br />Notes: EnSight will host weekly calls remotely to ensure key milestones are met and <br />action items are assigned/completed. <br />Software Build and Internal Testing <br />Duration: 6 weeks <br />Start: NTP + 1 week <br />Objective: Develop and validate software for the new system. <br />Pay Station software. <br />Banking setup. <br />Integration and Back-Office Reporting Setup. <br />Notes: Communication with the City’s accounting department to ensure all software and <br />banking information is correct, assuming timely information from the client. <br />Pre-Installation Infrastructure Prep and Marketing Plan Executed <br />Duration: 4 to 6 weeks <br />Start: NTP + 3 weeks <br />Objective: Installation and infrastructure preparation <br />Contractor Site Assessments: Inspect conduits and power; map device locations. <br />Procurement: Order equipment and verify network compatibility. <br />Cabling Preparation: Plan cable runs, install locations and pathways. <br />Objective: Prepare marketing materials and customer awareness. <br />Work on Static Signage Design <br />Flyers designed by Flowbird. <br />FAQ provided by Flowbird for City website. <br />Standard in-house produced video (note that custom video will need to be <br />quoted). <br />Initial Overview Training <br />Duration: 1 week <br />Start: May 25, 2026 (estimated) <br />Objective: Provide initial training overview for key operational team members. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 136 of 167)
The URL can be used to link to this page
Your browser does not support the video tag.