REV: 01-05-26 LR <br />Conduct training sessions on system operation for Flowbird, OmniQ and EnSight <br />solutions <br />System troubleshooting. <br />Distribute training materials and quick-reference guides. <br />Final Factory testing and Equipment Shipping <br />Duration: 12 weeks <br />Start: NTP <br />Objective: Begin procurement, manufacturing, conduct factory acceptance testing and <br />prepare equipment for deployment. <br />MSMs, LPR and MLPR cameras will be delivered to client location and delivered <br />to client laydown area. <br />Garage 1: Jefferson <br />Total Duration: 4.5 weeks + 2 days <br />Infrastructure Start: NTP + 6 weeks <br />2.Infrastructure (2.5 weeks) <br />o Site Assessment: Inspect conduits and power; map device locations. <br />o Procurement: Order equipment and verify network compatibility. <br />o Cabling Preparation: Plan cable runs and ensure code compliance. <br />3.Installation (1.5 weeks) <br />o Cabling: Run and test Cat6 cables. <br />o Device Installation: Mount and connect new devices. <br />o Network Configuration: Configure IP addresses and VLANs/subnets. <br />o Start: After Final Testing and Shipping (NTP + 12 weeks) and concurrent <br />with Marshal Infrastructure. <br />4.Commissioning and Testing <br />o Device Acceptance Testing: Validate device functionality and integration. <br />o Operational Testing: Run shadow mode, run test transactions and scripts, <br />and train staff. <br />o Implementation: Full rollout validation. <br />o Duration: 2-3 weeks. <br />5.Demolition and Cutover (2 days) <br />o Cutover: Execute during low-traffic hours, activate new system, and <br />monitor. <br />o Decommissioning: Remove and dispose of old equipment. <br />o Post-Cutover Validation: Monitor and address issues. <br />o Start: After Testing and Implementation. <br />Deliverables: Site assessment and test reports, training and cutover confirmation. <br />Garage 2: Marshall <br />Total Duration: 3 weeks + 2 days <br />1.Infrastructure (2 weeks) <br />o Conduit and Cabling: Run and test Cat6 cables. <br />o Electrical patching <br />o Start: After Jefferson Infrastructure (NTP + 8.5 weeks). <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 137 of 167)