Laserfiche WebLink
REV: 01-05-26 LR <br />2.Installation (1 week) <br />o Device Installation: Mount and connect new devices. <br />o Network Configuration: Configure IP addresses and VLANs/subnets. <br />o Start: After Final Testing and Shipping (NTP + 12 weeks) and concurrent <br />with Winslow Infrastructure. <br />3.Testing and Implementation <br />o Device Acceptance Testing: Validate device functionality and integration. <br />o Operational Testing: Run shadow mode, run test transactions and scripts, <br />and train staff. <br />o Implementation: Full rollout validation. <br />o Duration: 2-3 weeks. <br />4.Demolition and Cutover (2 days) <br />o Cutover: Execute during low-traffic hours, activate new system, and <br />monitor. <br />o Decommissioning: Remove and dispose of old equipment. <br />o Post-Cutover Validation: Monitor and address issues. <br />o Start: After Testing and Implementation. <br />Deliverables: Site assessment and test reports, training and cutover confirmation. <br />Garage 3: Winslow <br />Total Duration: 2.5 weeks + 2 days <br />1.Infrastructure (1.5 weeks) <br />o Site Assessment: Inspect conduits and power; map device locations. <br />o Procurement: Order equipment and verify network compatibility. <br />o Cabling Preparation: Plan cable runs and ensure code compliance. <br />o Start: After Marshal Infrastructure (NTP + 10.5 weeks). <br />2.Installation (1 week) <br />o Cabling: Run and test Cat6 cables. <br />o Device Installation: Mount and connect new devices. <br />o Network Configuration: Configure IP addresses and VLANs/subnets. <br />o Start: After Final Testing and Shipping (NTP + 12 weeks). <br />3.Testing and Implementation <br />o Device Acceptance Testing: Validate device functionality and integration. <br />o Operational Testing: Run shadow mode, run test transactions and scripts, <br />and train staff. <br />o Implementation: Full rollout validation. <br />o Duration: 2-3 weeks. <br />4.Demolition and Cutover (2 days) <br />o Cutover: Execute during low-traffic hours, activate new system, and <br />monitor. <br />o Decommissioning: Remove and dispose of old equipment. <br />o Post-Cutover Validation: Monitor and address issues. <br />o Start: After Testing and Implementation. <br />Deliverables: Site assessment and test reports, training and cutover confirmation. <br />30-Day Operational Demonstration Testing <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 138 of 167)