My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />2.Installation (1 week) <br />o Device Installation: Mount and connect new devices. <br />o Network Configuration: Configure IP addresses and VLANs/subnets. <br />o Start: After Final Testing and Shipping (NTP + 12 weeks) and concurrent <br />with Winslow Infrastructure. <br />3.Testing and Implementation <br />o Device Acceptance Testing: Validate device functionality and integration. <br />o Operational Testing: Run shadow mode, run test transactions and scripts, <br />and train staff. <br />o Implementation: Full rollout validation. <br />o Duration: 2-3 weeks. <br />4.Demolition and Cutover (2 days) <br />o Cutover: Execute during low-traffic hours, activate new system, and <br />monitor. <br />o Decommissioning: Remove and dispose of old equipment. <br />o Post-Cutover Validation: Monitor and address issues. <br />o Start: After Testing and Implementation. <br />Deliverables: Site assessment and test reports, training and cutover confirmation. <br />Garage 3: Winslow <br />Total Duration: 2.5 weeks + 2 days <br />1.Infrastructure (1.5 weeks) <br />o Site Assessment: Inspect conduits and power; map device locations. <br />o Procurement: Order equipment and verify network compatibility. <br />o Cabling Preparation: Plan cable runs and ensure code compliance. <br />o Start: After Marshal Infrastructure (NTP + 10.5 weeks). <br />2.Installation (1 week) <br />o Cabling: Run and test Cat6 cables. <br />o Device Installation: Mount and connect new devices. <br />o Network Configuration: Configure IP addresses and VLANs/subnets. <br />o Start: After Final Testing and Shipping (NTP + 12 weeks). <br />3.Testing and Implementation <br />o Device Acceptance Testing: Validate device functionality and integration. <br />o Operational Testing: Run shadow mode, run test transactions and scripts, <br />and train staff. <br />o Implementation: Full rollout validation. <br />o Duration: 2-3 weeks. <br />4.Demolition and Cutover (2 days) <br />o Cutover: Execute during low-traffic hours, activate new system, and <br />monitor. <br />o Decommissioning: Remove and dispose of old equipment. <br />o Post-Cutover Validation: Monitor and address issues. <br />o Start: After Testing and Implementation. <br />Deliverables: Site assessment and test reports, training and cutover confirmation. <br />30-Day Operational Demonstration Testing <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 138 of 167)