Laserfiche WebLink
REV: 01-05-26 LR <br />for the overall equipment, system functionality and performance, and ongoing <br />service, repair, and support on a turnkey basis. <br />3.2 Contractor is to appoint a Project Manager who will be the primary interface to <br />Owner and who will coordinate the activities of all of Contractor’s teaming <br />partners and subcontractors. <br />3.3 Refer to the “Execution” sections of the Specification documents listed in Section <br />1.1 above for further details. <br />END OF SECTION 01 11 00 <br />© 2026 Walker Consultants. All rights reserved. No part of this SECTION 01 11 00 may <br />be reproduced in any form or by any means without permission from Walker Consultants, <br />except as expressly authorized for use by the City of Redwood City for internal and <br />project-related purposes and for public disclosure as required by law. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 29 of 167)