My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />1.9 POST-AWARD INFORMATIONAL AND CLOSEOUT SUBMITTALS <br />A. All submittal approvals, comments and rejections will be returned to the <br />Contractor by the Owner’s designated representative with requests for <br />resubmittal as appropriate. Resubmit as required until submittal is approved by <br />the Owner’s designated representative. <br />B. Distribute to the Owner within 45 days after award of contract submittals <br />containing all installation diagrams, installation instructions, details, shop <br />drawings, riser diagrams, and templates required for installing, setting, <br />anchoring and/or mounting, and connecting all MSMs including but not limited <br />to any required servers, network switches, etc. <br />C. Equipment Manuals to be submitted 14 days prior to commencement of testing, <br />per section 3.3. <br />D. Acceptance Test Plans to be submitted for review by Owner at least 30 days prior <br />to commencement of such testing, <br />E. Samples: Submit samples of reports, receipts, and other items to be selected by <br />Owner within 30 days of contract. <br />1.10 MAINTENANCE MATERIAL SUBMITTALS <br />A. Stock: Furnish the following operating stock items prior to commencement of <br />operational testing. <br />1. Ten rolls of receipt paper per MSM. Owner must approve color and artwork <br />of receipts. <br />B. Lock and Key Requirements: <br />1. Identical locks and keys for all like equipment but unique to this project so <br />that keys from other projects will not provide access. <br />2. Provide Owner with three (3) sets of maintenance keys. <br />3. If a special tool is required to perform any function or maintenance, provide <br />three (3) of these tools. <br />1.11 QUALITY ASSURANCE <br />A. All components and installation to comply with all laws, ordinances, codes, rules, <br />and regulations of public authorities having jurisdiction over this part of the work. <br />It is the responsibility of the Contractor to meet these and all other current <br />technical, performance, and safety standards that are applicable to all <br />components and to the entire system, even when not specifically referenced. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 39 of 167)
The URL can be used to link to this page
Your browser does not support the video tag.