My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />B. Open-architecture system where all interfaces (hardware and software) conform <br />to national and International Organization for Standardization (ISO) standards. <br />C. All materials and equipment listed, labeled, or certified by a nationally recognized <br />testing laboratory to meet Underwriters Laboratories, Inc. (UL) standards, where <br />test standards have been established. <br />1. Equipment and materials which are not covered by UL Standards may be <br />considered, provided equipment and material is listed, labeled, certified or <br />otherwise determined to meet safety requirements of a nationally <br />recognized testing laboratory. <br />2. Equipment of a class for which no nationally recognized testing laboratory <br />accepts, certifies, lists, labels, or determines to be safe, will be considered <br />if inspected or tested in accordance with national industrial standards, such <br />as NEMA, IP, or ANSI. Evidence of compliance includes certified test <br />reports and definitive product data. <br />D. Equipment housings, conduits, and junction boxes exposed to weather (any <br />location not in a conditioned environment) will meet or exceed NEMA 3SX or IP54 <br />standards to be moisture-proof and provide sufficient protection so that the <br />components continue to function without moisture, dust, particle, heat, or cold- <br />related interruption. Components that do not meet NEMA 3SX or IP54 standards <br />or better may be considered if implemented with supplemental environmental <br />controls to sufficiently protect equipment. <br />1.12 DELIVERY, STORAGE AND HANDLING REQUIREMENTS <br />A. Prior to shipment of any equipment, a Factory Acceptance Test process must be <br />completed and documented by Contractor, and the certificates of FAT completion <br />reviewed and approved by Owner, in accordance with the description in Section <br />2.3 below. <br />B. Contractor is responsible for insuring all shipped items. Any items damaged <br />during shipping are to be replaced and shipped to the project site, by expedited <br />means if requested, at no additional cost to the Owner. <br />C. Owner, at their sole discretion, may agree to provide a designated <br />storage/staging area of no more than 100 square feet of floor space for equipment <br />that has not been installed. Location to be determined after contract award. <br />Contractor should assume in their proposal that no storage area will be provided. <br />If a storage area is provided, Contractor is responsible for securing that storage <br />area with a suitable lock. <br />D. Deliver equipment to project site in manufacturer’s original containers to prevent <br />damage and marked for easy identification. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 40 of 167)
The URL can be used to link to this page
Your browser does not support the video tag.