Laserfiche WebLink
REV: 01-05-26 LR <br />B. Open-architecture system where all interfaces (hardware and software) conform <br />to national and International Organization for Standardization (ISO) standards. <br />C. All materials and equipment listed, labeled, or certified by a nationally recognized <br />testing laboratory to meet Underwriters Laboratories, Inc. (UL) standards, where <br />test standards have been established. <br />1. Equipment and materials which are not covered by UL Standards may be <br />considered, provided equipment and material is listed, labeled, certified or <br />otherwise determined to meet safety requirements of a nationally <br />recognized testing laboratory. <br />2. Equipment of a class for which no nationally recognized testing laboratory <br />accepts, certifies, lists, labels, or determines to be safe, will be considered <br />if inspected or tested in accordance with national industrial standards, such <br />as NEMA, IP, or ANSI. Evidence of compliance includes certified test <br />reports and definitive product data. <br />D. Equipment housings, conduits, and junction boxes exposed to weather (any <br />location not in a conditioned environment) will meet or exceed NEMA 3SX or IP54 <br />standards to be moisture-proof and provide sufficient protection so that the <br />components continue to function without moisture, dust, particle, heat, or cold- <br />related interruption. Components that do not meet NEMA 3SX or IP54 standards <br />or better may be considered if implemented with supplemental environmental <br />controls to sufficiently protect equipment. <br />1.12 DELIVERY, STORAGE AND HANDLING REQUIREMENTS <br />A. Prior to shipment of any equipment, a Factory Acceptance Test process must be <br />completed and documented by Contractor, and the certificates of FAT completion <br />reviewed and approved by Owner, in accordance with the description in Section <br />2.3 below. <br />B. Contractor is responsible for insuring all shipped items. Any items damaged <br />during shipping are to be replaced and shipped to the project site, by expedited <br />means if requested, at no additional cost to the Owner. <br />C. Owner, at their sole discretion, may agree to provide a designated <br />storage/staging area of no more than 100 square feet of floor space for equipment <br />that has not been installed. Location to be determined after contract award. <br />Contractor should assume in their proposal that no storage area will be provided. <br />If a storage area is provided, Contractor is responsible for securing that storage <br />area with a suitable lock. <br />D. Deliver equipment to project site in manufacturer’s original containers to prevent <br />damage and marked for easy identification. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 40 of 167)