My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />correctly, 98 percent (98%) of the time for all non-exception vehicles as <br />defined within this section. <br />5. Exception vehicles do not count against the accuracy of the LPR system. <br />For the purposes of the LPR performance requirements an exception <br />vehicle is defined as: <br />a. Any vehicle whose license plate is obstructed, obscured, or <br />encroached upon by a foreign object. <br />b. Vehicles that contain excessive graphics and advertising such that it <br />is impossible for the LPR system to determine which graphics belong <br />to the license plate and which graphics do not. <br />c. Vehicles with no license plate. <br />d. Vehicles with temporary cardboard (non-reflective) “Dealer Plates.” <br />e. Motorcycles. <br />6. Provide a means, subject to approval by the City, to remotely score the LPR <br />system to ensure it meets the performance requirements. Provide all <br />software needed to test the LPR system’s performance, downloadable to a <br />standalone PC used for testing. <br />B. Fully operational regardless of extreme weather such as heat, sun, rain, ice, <br />snow, freezing rain, etc. <br />C. Operating temperature range of -30 to +55 Celsius and to 95% RH. <br />1.5 PRICE REQUIREMENTS: <br />A. Price includes the provision of all material, labor, equipment, and services <br />necessary to furnish and install fully integrated mobile LPR system as outlined <br />herein. Installation is to occur on Owner-provided parking enforcement vehicles. <br />B. Extended Hardware Maintenance and Software Support: Provide pricing for <br />Maintenance, Service, and Parts Contract after two-year initial warranty: <br />1. A separate contract awarded for Maintenance, Service and parts that would <br />commence with expiration of two-year warranty period. <br />2. Provide annual pricing for five (5) years after initial two-year warranty <br />period. <br />C. Substantial Completion: A certificate of substantial completion will be provided <br />when the following requirements have been satisfied: <br />1. All systems, features and communications, have passed the SAT per <br />Section 3.2 of this document. <br />2. All spare parts, stock material and manuals are on site and have been <br />approved. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 63 of 167)
The URL can be used to link to this page
Your browser does not support the video tag.