Laserfiche WebLink
REV: 01-05-26 LR <br />3. All test checklists, documentation and training has been completed. <br />D. Final Acceptance: Final Acceptance will occur upon satisfactory completion of all <br />work, tests, demonstrations and training specified herein as well as successful <br />completion of sixty-day operational test per Section 3.2 of this document. <br />1.6 ADMINISTRATIVE REQUIREMENTS <br />A. Coordination: <br />1. Distribute to the appropriate parties any installation diagrams, details, and <br />templates for setting, anchoring and/or mounting meters. <br />2. Coordinate interfaces with any other systems by others, including but not <br />limited to Local Area Network, MSM/SSM/PbC vendors, etc. <br />1.7 PROPOSAL SUBMITTALS - TO BE INCLUDED WITH RESPONSE <br />A. Price Form: <br />1. Total system cost (design, manufacture, shipping, installation, training, <br />commissioning, etc.). <br />2. Include per unit cost of each component. <br />3. Include any and all recurring fees. <br />4. Include recommended spare parts to be kept on-site. <br />B. Product Data: <br />1. Product description for each component including the following: <br />a. Detail of user interface. <br />b. Operating temperature and humidity ranges. <br />c. Camera housing materials. <br />d. Photos of installed system, including and identifying base products <br />and options. <br />e. Installation and mounting requirements for installation on Owner- <br />provided parking enforcement vehicles. <br />f. List of modular components that may be replaced by hand. <br />g. List of components that require tools for replacement, and identify <br />which tools are required. <br />2. RMA process and procedures. <br />3. Description of the LCMS software, including the following: <br />a. Configuration diagram. <br />b. Software platforms and programming language. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 64 of 167)