REV: 01-05-26 LR <br />updates as they are made commercially available by the operating system <br />developer. <br />5. Coordinate the testing and implementation of all patches and updates with <br />the Owner. <br />6. Support upgrades to the application based on operating system patch and <br />upgrade requirements. For example, if run on a Microsoft operating system, <br />the software can be patched according to the Microsoft patch and upgrade <br />schedule without breaking any application. If Microsoft decommissions an <br />operating system, the Contractor must be capable of releasing code <br />compatible with next operating system upgrade prior to Microsoft ending <br />support for current operating system. <br />7. If at any time the Contractor ceases to do business or ceases to make the <br />software product commercially available, the Owner will assume full <br />ownership of the software. Thirty days prior to ceasing to do business, the <br />Contractor will provide the most current version of the software source code <br />to the Owner. <br />8. Provide corrective patches and upgrades in the event security vulnerability <br />or system availability issues are discovered. <br />1.11 DELIVERY, STORAGE, AND HANDLING REQUIREMENTS <br />A. Prior to shipment of any equipment, a Factory Acceptance Test process must be <br />completed and documented by Contractor, and the certificates of FAT completion <br />reviewed and approved by Owner, in accordance with the description in Section <br />2.3 below. <br />B. Contractor is responsible for insuring all shipped items. Any items damaged <br />during shipping are to be replaced and shipped to the project site, by expedited <br />means if requested, at no additional cost to the Owner. <br />C. Owner, at their sole discretion, may agree to provide a designated <br />storage/staging area of no more than 100 square feet of floor space for equipment <br />that has not been installed. Location to be determined after contract award. <br />Contractor should assume in their proposal that no storage area will be provided. <br />If a storage area is provided, Contractor is responsible for securing that storage <br />area with a suitable lock. <br />D. Deliver equipment to project site in manufacturer’s original containers to prevent <br />damage and marked for easy identification. <br />E. Once equipment has been delivered to the project site, it is the Contractor’s <br />responsibility to protect the equipment from theft and damage until Final <br />Acceptance and to insure the stored equipment against risk of loss and damage. <br />Contractor is to replace any lost or damaged equipment at no additional cost to <br />the Owner. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 88 of 167)