Laserfiche WebLink
REV: 01-05-26 LR <br />lighting elements required to mitigate the effect of the ambient lighting conditions <br />on the LPR system performance. <br />E. Perform all optical character recognition. <br />F. RF shielded camera cables. <br />G. Internal heating elements. <br />H. Rated at 30 frames per second. <br />I. Anti-theft mounting /removal brackets. <br />J. Equipped with IR lens for license plate and color image for verification. <br />K. Capable of multiple images with multiple flash and shutter settings. <br />L. Pulsed LED illumination. <br />2.3 SOURCE QUALITY CONTROL <br />A. Factory Acceptance Test (FAT) <br />1. It is required that adequate documentation of the proper functioning of the <br />equipment in its complete, originally manufactured state be conducted by <br />the Contractor prior to delivery of equipment to the project site. Such testing, <br />known as a Factory Acceptance Test (FAT), is meant to ensure that all <br />equipment is known and demonstrated to be working correctly via a <br />documented FAT procedure and a certificate of completion of FAT is <br />provided to the Owner. Owner or Owner’s agent will not attend the FAT at <br />Contractor’s site; Contractor is responsible for conducting FAT using their <br />own resources. <br />2. All equipment is to have successfully passed formal manufacturing FATs <br />and quality assurance inspections to validate compliance with these <br />functional specifications prior to shipment to the project site. <br />3. Records for formal internal Contractor FAT and inspection for performance, <br />materials quality and/or workmanship are to be produced by the Contractor <br />and sent as formal project submittals to Owner for review prior to shipment <br />of equipment to the project site. Equipment is not to be released for <br />shipment until Owner has approved the FAT submittals. <br />4. Contractor is also to have readily available proof of product reliability <br />analysis and testing should reliability become a problem at any time from <br />the beginning of installation testing through the final operational test period <br />PART 3 - EXECUTION <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 92 of 167)