My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />lighting elements required to mitigate the effect of the ambient lighting conditions <br />on the LPR system performance. <br />E. Perform all optical character recognition. <br />F. RF shielded camera cables. <br />G. Internal heating elements. <br />H. Rated at 30 frames per second. <br />I. Anti-theft mounting /removal brackets. <br />J. Equipped with IR lens for license plate and color image for verification. <br />K. Capable of multiple images with multiple flash and shutter settings. <br />L. Pulsed LED illumination. <br />2.3 SOURCE QUALITY CONTROL <br />A. Factory Acceptance Test (FAT) <br />1. It is required that adequate documentation of the proper functioning of the <br />equipment in its complete, originally manufactured state be conducted by <br />the Contractor prior to delivery of equipment to the project site. Such testing, <br />known as a Factory Acceptance Test (FAT), is meant to ensure that all <br />equipment is known and demonstrated to be working correctly via a <br />documented FAT procedure and a certificate of completion of FAT is <br />provided to the Owner. Owner or Owner’s agent will not attend the FAT at <br />Contractor’s site; Contractor is responsible for conducting FAT using their <br />own resources. <br />2. All equipment is to have successfully passed formal manufacturing FATs <br />and quality assurance inspections to validate compliance with these <br />functional specifications prior to shipment to the project site. <br />3. Records for formal internal Contractor FAT and inspection for performance, <br />materials quality and/or workmanship are to be produced by the Contractor <br />and sent as formal project submittals to Owner for review prior to shipment <br />of equipment to the project site. Equipment is not to be released for <br />shipment until Owner has approved the FAT submittals. <br />4. Contractor is also to have readily available proof of product reliability <br />analysis and testing should reliability become a problem at any time from <br />the beginning of installation testing through the final operational test period <br />PART 3 - EXECUTION <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 92 of 167)
The URL can be used to link to this page
Your browser does not support the video tag.