My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />1. After go-live date, the Owner will conduct an operational test for thirty (30) <br />days. <br />2. Performance Standards: <br />a. System is fully operational without downtime or programming <br />problems for the complete monthly reporting cycle. For each down <br />time period of between one hour and eight hours, or programming <br />problems that delay the report cycle, two days will be added to the test <br />duration. <br />b. All reports correlate 100% with data from the Pay-by-Plate (PbP) Multi- <br />Space Parking Meter (MSM) System and the monthly permit system. <br />3. Maintain detailed records and a logbook of all tests, events and issues to <br />be provided to the Owner upon completion of the tests. <br />3.3 INSTRUCTION AND TRAINING <br />A. Fully instruct the Owner’s designated personnel in the operation, adjustment, and <br />maintenance of all products, equipment, and systems. <br />B. Coordinate scheduling of on-site and in-person instructional classes with Owner’s <br />designated personnel to avoid conflicts and peak-period personnel demands. <br />C. Submit a proposed instruction schedule prior to equipment installation. Owner <br />will tentatively approve or suggest changes to the training schedule. <br />D. Ample time should be allotted within each session for the instructor to fully <br />describe and demonstrate all aspects of the system and allow Owner personnel <br />to have hands-on experience with the meters. <br />E. All instruction courses will consist of classroom instruction and actual “hands-on” <br />experience. Classes will be set up in a room designated by the Owner. <br />F. Provide experienced instructors that speak fluent English in a clear precise <br />manner. <br />G. Provide all documentation required for instructing Owner personnel. The Owner <br />retains the right to copy training materials as frequently as required for ongoing <br />internal use only. <br />H. Provide an instructional notebook or user’s manual to accompany every <br />instruction course. Submit a hard copy and electronic version of all manuals <br />(operation and maintenance) written in common English with appropriate photos, <br />diagrams, and schematics to supplement the text. <br />I. Training categories: <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 94 of 167)
The URL can be used to link to this page
Your browser does not support the video tag.