My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2026.01.26 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2026
>
Agda Pkt 2026.01.26 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 11:37:07 AM
Creation date
1/27/2026 11:34:59 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
1/26/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br />corridor to slow speeds. Figure 1 shows an example of horizontal deflection. The design maintained all existing <br />vehicles lanes and existing bikeway designation on the corridor as a Class III bikeway (bike route). <br />Key Community Feedback: <br /> Support for enhancing parallel bike corridors, for example one block away since Alternative 1 would not <br />include a dedicated bike lane. <br />Figure 1 – Example of Horizontal Deflection <br /> <br />Alternative 2 Still focused on enhanced ADA curb ramps, crossings and access for pedestrians and also proposed <br />removing all on-street parking along Jefferson Avenue to make room for a Class II bikeway (bike lanes) and, where <br />space allowed, a Class IV bikeway (physically separated bikeway). These additions would visually narrow the <br />roadway to improve safety. The design maintained all existing vehicles lanes and because of existing roadway width <br />constraints, there was not enough space to install dedicated bike lanes continuously on all blocks, so those <br />segments remained a Class III bikeway (bike route). This design created safer crossings for pedestrians and <br />bicyclists using PHBs at few intersections. <br />Key Community Feedback: <br /> Concern about the bike lanes being discontinuous <br /> Concern that vehicles would drive faster without parking along the street <br />Alternative 3 Still focused on enhanced ADA curb ramps, crossings and access for pedestrians and also proposed <br />that one travel lane in each direction be removed so that a continuous Class IV bikeway (physically separated <br />bikeway) or Class II (bike lane) could be installed along the corridor. It enhanced pedestrian and bicycle crossings <br />with median islands, curb extensions, and PHBs at a few intersections. Medians and crossing islands introduced <br />horizontal deflections along the corridor to slow speeds. <br />Key Community Feedback: <br /> Concern that the lane reduction would slow traffic <br />11.B. - Page 12 of 17 <br />189
The URL can be used to link to this page
Your browser does not support the video tag.