Agmt26 BKF Engineers - Amendment No. 1 for Price Pump Station Design Station
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 BKF Engineers - Amendment No. 1 for Price Pump Station Design Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 12:46:33 PM
Creation date
2/4/2026 12:46:30 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Price Pump Station Design Station
RMP File Number
304
Date
2/2/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-21-26 LR <br />Exhibit “A” <br />SCOPE OF SERVICES AND FEE <br />Consultant shall be paid on a time and material basis not-to-exceed amount of <br />$1,405,760.00 following the fee schedule and hourly rates provided in Exhibit B. <br />Table A - Original Tasks <br />The following budgets for tasks from the Original Agreement shall be amended as described <br />below: <br />Task #Description Original Budget Amended Budget <br />1 Project Management and <br />Meetings <br />$111,290.00 $108,402.00 <br />2 Site Surveys and Investigations $70,806.00 $70,739.00 <br />3 Hydrologic and Hydraulic Analysis <br />and Physical Hydraulic Modeling <br />$99,195.00 $109,695.00 <br />4 Alternatives Analysis and Basis of <br />Design Report <br />$57,444.00 $57,444.00 <br />5 Environmental and Permitting $1,838.00 $1,838.00 <br />6 60% Initial Design Submittal $186,476.00 $297,969.00 <br />7 90% Semi-Final Design Submittal <br />for Grant Review <br />$130,645.00 $201,313.00 <br />8 100% Final Design Submittal for <br />Construction <br />$74,325.00 $96,070.00 <br />Removed Tasks <br />The following tasks have been removed from the scope of work within the Original <br />Agreement: <br />9 Bid Support and Construction <br />Services <br />$129,754.00 - <br />OPT 1 Boundary Survey/Record of <br />Survey <br />$11,710.00 - <br />OPT 5 Green Infrastructure $60,488.00 - <br />OPT 6 PLC/SCADA Programming and <br />Startup Assistance <br />$81,199.00 - <br />OPT 13 Process and Instrumentation <br />Diagrams <br />$21,605.00 - <br />Authorized Tasks Subtotal $1,036,775.00 $943,470.00 <br />Table B – Previously Authorized Renumbered Tasks <br />The following tasks were previously authorized and created through task orders and shall be <br />remembered as indicated below: <br />Existing Task # New Task #Description Original Budget Amended Budget <br />OPT 10 10 Project <br />Management and <br />42” Outfall CCTV <br />-$7,363.00 <br />OPT 12 11 Outfall Replacement $74,226.00 $62,821.00 <br />ATTY/AGR.2026/Amend. No.1/BKF Engineers (Amendment No. 1 to Agreement for Services) (Page 4 of 10)