My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 BKF Engineers - Amendment No. 1 for Price Pump Station Design Station
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 BKF Engineers - Amendment No. 1 for Price Pump Station Design Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 12:46:33 PM
Creation date
2/4/2026 12:46:30 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Price Pump Station Design Station
RMP File Number
304
Date
2/2/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-21-26 LR <br />9.2 – Topographic Field Survey <br />The Consultant shall provide the field work to prepare a Topographic Survey for the length <br />of improvements on Price Avenue. The work is anticipated to include the following: <br />Field Survey: The Consultant shall conduct a topographic survey utilizing traditional <br />ground surveying methods to complete detailed topographic mapping of Price Avenue <br />from the Brewster Avenue intersection to the upstream end of the improvements at <br />Convention Way, an area approximately 900 feet by 50 feet. The survey will include, but <br />not be limited to, general topography, edge of roadway, curbs and gutters, top of curb, <br />back of walk, signs, and any visible infrastructure such as drainage improvements, <br />sanitary sewer, water, utility poles and overhead utilities. Accessible gravity utilities shall <br />be opened and “dipped” to obtain pipe size, direction, and invert elevation. <br />Underground Utility Locating: The Consultant’s in-house utility locators shall perform utility <br />investigation services using standard industry acceptable methods as per California <br />Government Code section 4216 to determine the approximate horizontal position and <br />depth of detectable utility lines within the area described above. The Consultant’s field <br />crews will use a water-based paint to mark the investigation results on the ground surface. <br />The Consultant may opt to use the Ground Penetrating Radar (GPR), if the soil conditions <br />will return a good signal to attempt to locate utility lines with no tracer wires. Individual field <br />conditions will dictate the thoroughness of the subsurface utility investigation. The <br />Consultant shall make a reasonable effort to determine the location of the existing <br />underground utility lines. Irrigation lines, empty conduits, and abandoned utilities will not <br />be located. <br />Mapping: The signed hardcopy Topographic Map will be an instrument of service. <br />Electronic mapping will be completed in an AutoCAD format and can be transferred and <br />used by others for future projects. <br />• The mapping is anticipated to be 1” = 20’. BKF will take a series of photographs <br />for future reference and documentation of current field conditions encountered <br />during the time of survey. <br />• The vertical control for the survey will be tied to the North American Vertical <br />Datum of 1988 (NAVD88). <br />• The horizontal location and rotation of the mapping is anticipated to be on <br />California State Plane Coordinates, Zone III based on the North American <br />Datum of 1983 (NAD83). The mapping will be done in ground distance. <br />Deliverables: Topographic survey in AutoCAD Civil 3D electronic drawing files (dwg) <br />9.3 – 60% Storm Drain Design <br />The Consultant will develop the design for the upsized storm drain on Price Avenue and <br />prepare construction documents including plans, specifications, and engineer’s cost <br />estimate to a 60% level of completion. The additional construction documents will be <br />included in the 60% Initial Design Submittal. <br />Anticipated plan sheets shall include: <br />• Demolition Plan; <br />• Storm Drain Plan and Profile; <br />• Civil Details; <br />• Standard MUTCD Traffic Control Details. <br />ATTY/AGR.2026/Amend. No.1/BKF Engineers (Amendment No. 1 to Agreement for Services) (Page 6 of 10)
The URL can be used to link to this page
Your browser does not support the video tag.