Laserfiche WebLink
REV: 12-03-25 LR <br />-Construction Meetings – Consultant shall attend construction meetings throughout the <br />Construction process via video or teleconference. <br />-Requests for Information (RFIs) – Consultant shall respond to reasonable and appropriate <br />Contractor requests for information made in accordance with the Contract Documents and <br />issue necessary clarifications and interpretations. Any orders authorizing variations from the <br />Contract Documents shall be only by Client. <br />-Shop Drawings and Material Submittals – Consultant shall review submitted shop drawings <br />and materials data for general conformance with the Contract Documents. Consultant shall <br />assist the City Engineer or their designee to evaluate and determine the acceptability of <br />substitute or “equivalent” materials proposed by the Contractor. <br />Consultant shall have no responsibility for any contractor’s means, methods, techniques, <br />equipment choice and usage, sequence, schedule, safety programs, or safety practices, nor shall <br />Consultant have any authority or responsibility to stop, supervise, control, or direct the work of <br />any contractor. <br />Task 12 – Record Drawings <br />Upon completion of construction, Consultant shall prepare a record drawing(s) showing changes <br />reported during construction. <br />-The conformed record drawings shall be based on the Contractor or City Resident Engineer’s <br />mark-ups of the project drawings. <br />-The record drawings incorporate the as-built information and shall be dated and signed by <br />the Engineer(s) of Record (EOR) prior to being submitted to the City Engineer. A total of up to <br />40 hours is budgeted for this purpose. <br />Deliverable: <br />Record Drawings (PDF) <br />At the completion of this Scope of Services, Consultant shall provide the following to the City <br />staff: <br />1. Electronic files (in AutoCAD 2023 format) for all drawings completed by Consultant <br />ATTY/AGR.2025.333/Kimley-Horn (Bay Road Complete Streets) (Page 24 of 50)