REV: 01-23-26 LR <br />Sawcut/break existing grade where equipment and EPU will be <br />located, and trench between; <br />Excavate to required depth for foundations, trenched conduit; <br />Install electrical and drainage conduit, rebar, posts, bollards and <br />frame to secure; <br />Install concrete and vibrate; Cure; <br />Set EPU; <br />Install and tap sump pit, gravity drain, drain conduit outside of bollard <br />foundation; <br />Install and terminate power wiring at EPU/sump/heat from <br />distribution; <br />o Card readers; Access Control; <br />o Integration with the access controls system (can provide dry-contact for <br />communication); <br />o Sequence of Operation requiring different modes and complex <br />programming; <br />o Battery Backup Up (not available for this product); <br />o Heat specifics <br />Power wiring and 30A double pull breaker from power distribution to <br />Box (calc by electrician) <br />3-wire feeder from Box to Quazite (calc by electrician) <br />Conditions and items needing coordination: <br />o Power and comm wiring/schedule; Power and comm conduit/schedule; <br />o Power terminated at EPU within 2 days of Tech mobilization; <br />o Sequence of operations; <br />o EPU within 10ft of the operable bollards; <br />o Slope tolerance <br />Front (Unsecured) to Back (Secure): Must be flat and level <br />Left (Front) to Right (Front): Must be flat and level <br />o Barrier heat system located under or within the barrier footprint only and is <br />designed for proper operation of the barrier during cold weather conditions. <br />This is NOT a complete snow melt system for the roadway; (independent <br />power circuits needed) <br />o External sump pit may needed to bring water to a shallower discharge <br />(independent power circuits needed) into storm drain piping or riser, or to <br />surface for daylight, etc.; Connections to storm drain will likely require <br />licensed plumber; <br />o Cure roadway concrete at least 72 hours before allowable traffic; <br />o In addition to complete blockage of the roadway, the sidewalks will also be <br />blocked due to safety concerns (plan to be developed), laydown, and <br />parking required; <br />ATTY/AGR.2026.014/Interllimar Inc., dba Concentric Security(Broadway Bollards) (Page 10 of 13)