Laserfiche WebLink
REV: 01-23-26 LR <br />Exhibit “A” <br />SPECIFICATIONS and SCOPE OF WORK <br />Broadway West <br />Furnish Only Anti-Vehicle Bollards, to Include: <br />(2) Heald EVO Operable Bollard; Electric Operation; Stainless Cover; <br />o IWA 14-1 2013: Bollard V/7200[N2A]/64/90:1.3 (~ ASTM M40) <br />(1) Electric Power Unit (EPU); std painted finish; <br />o 6 second close; 3 second close for Emergency Fast Operation (EFO); <br />o 480 VAC 60 Hz or 208 – 240 VAC 60 Hz; 3 phase <br />o 208VAC 1/Phase option is available 6 second close (NON-EFO). <br />o Tethered ush-button UP/DOWN; <br />(1) heat trace <br />o Controller, thermostat, NEMA box; 208-277 single phase recommended; <br />o Trace; 16’ cold lead; 100’ wire probe (could be 150’ wire probe if needed); <br />(3) Gibraltar Fixed Bollards; Stainless Cover; Shallow foundation; <br />o ASTM M50 P1 on 5’ centers for 3-array (will be engineered M40 P1 or M50 <br />P2 to match 40” operable bollard height) <br />Broadway East <br />Furnish Only Anti-Vehicle Bollards, to Include: <br />(2) Heald EVO Operable Bollard; Electric Operation; Stainless Cover; <br />o IWA 14-1 2013: Bollard V/7200[N2A]/64/90:1.3 (~ ASTM M40) <br />(1) Electric Power Unit (EPU); std painted finish; free-standing; <br />o 6 second close; 3 second close for Emergency Fast Operation (EFO); <br />o 480 VAC 60 Hz or 208 – 240 VAC 60 Hz; 3 phase <br />o 208VAC 1/Phase option is available 6 second close (NON-EFO). <br />o Tethered Push-button UP/DOWN; <br />(1) heat trace <br />o Controller, thermostat, NEMA box; 208-277 single phase recommended; <br />o Trace; 16’ cold lead; 100’ wire probe (could be 150’ wire probe if needed); <br />(3) Gibraltar Fixed Bollards; Stainless Cover; Shallow foundation; <br />o ASTM M50 P1 on 5’ centers for 3-array (will be engineered M40 P1 or M50 <br />P2 to match 40” operable bollard height) <br />Provide Oversight for the City, shall Include: <br />To be properly certified, oversight is required for installation compliance of the <br />manufacturer’s installation requirements. This is accomplished through the <br />Vendor’s checklist of the inspection/hold points. The means and the methods are <br />at the sole discretion of the City, provided it does not compromise the certification <br />requirements and/or deviate from the manufacturer’s requirements. <br />Labor & Expenses (airfare, rental car, food, lodging, gas, tolls, subway, etc.) <br />Work schedule <br />o Preconstruction Meeting - 1 weekday <br />o Receiving/unloading/staging/condition of new barrier product Oversight - 1 <br />weekday <br />ATTY/AGR.2026.014/Interllimar Inc., dba Concentric Security(Broadway Bollards) (Page 8 of 13)