Laserfiche WebLink
REV: 03-02-26 VR <br />[Additional] TASK 5 – 60% DESIGN SUBMITTAL <br />Tasks and deliverables as described in the original agreement. The Consultant shall include the <br />YMCA portion of work as described in Figure 1 and Table 1. <br />[Additional] TASK 6 – 90% DESIGN SUBMITTAL <br />Tasks and deliverables as described in the original agreement. The Consultant shall include the <br />YMCA portion of work as described in Figure 1 and Table 1. <br />[Additional] TASK 7 – 100% FINAL DESIGN SUBMITTAL <br />Tasks and deliverables as described in the original agreement. The Consultant shall include the <br />YMCA portion of work as described in Figure 1 and Table 1. <br />ASSUMPTIONS <br />1. The City has stated that the Regional Stormwater Capture Project is currently on hold and <br />the Consultant will not need to coordinate with that project during design development. <br />2. It is assumed that the final scope of work will not impact the existing Hetch Hetchy <br />pipelines or the existing concrete storm channel; hence, no geotechnical or special <br />encroachment permits will be necessary. <br />3. Scope does not include structural design. <br />4. Title reports do not need to be obtained along the park site. <br />5. The sewer line near the Memorial Building/Senior Center was not relocated during building <br />construction. <br />6. The Consultant shall inform the City Engineer or their designee when trees within the park <br />site are impacted. Trees must be protected from damage and it will be up to the City to <br />determine any required tree mitigation measures, as applicable. Arborist surveys and <br />design of tree mitigation measures are not included. <br />7. Public outreach or other coordination with City departments other than Engineering and <br />Transportation department staff is not required. <br />SCHEDULE <br />The work under this Scope of Services adds approximately 6 weeks to the original proposed <br />project schedule. The revised project scheduled is included in Attachment A, and the key <br />milestones are outlined below. <br />Description Estimated Schedule <br />60% PS&E July 2026 <br />90% PS&E September 2026 <br />100% PS&E November 2026 <br />Construction February 2027 – September 2027 <br />FEE <br />The Consultant shall perform the Scope of Services as described in this Exhibit “A” for a not-to- <br />exceed amount of Seventy-Six Thousand Seven Hundred Thirteen Dollars ($76,713). The total <br />contract amount is not-to-exceed Six Hundred Ninety-Four Thousand Nine Hundred Forty Dollars <br />($694,940). The table below summarizes the original and revised contract amounts. The full task- <br />based fee is included in Attachment B. <br />ATTY/AGR.2026/Amend. No.1/BKF Engineers (2025-2026 Sanitary Sewer Capacity Improvement Proj) (Page 7 of 11)