My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Walker Consultants, Inc. - Garage Repair & Elevator Modernization
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Under $110K
>
Agmt26 Walker Consultants, Inc. - Garage Repair & Elevator Modernization
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2026 4:24:30 PM
Creation date
3/31/2026 4:24:25 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304.5
Date
3/27/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 03-02-26 VR <br />TOTAL PROJECT COST <br />The total not-to-exceed cost for Part A (Elevator Modernization) is Thirty-Nine Thousand <br />Seven Hundred Fifty Dollars ($39,750.00). The total not-to-exceed cost for Part B <br />(Garage Repair) is Fifty-Eight Thousand Eight Hundred Forty Dollars ($58,840.00). The <br />total not-to-exceed amount for all services under this Agreement is Ninety-Eight <br />Thousand Five Hundred Ninety Dollars ($98,590.00). The total project Not-To-Exceed <br />Fee Schedule is presented in Table 2 below. Consultant will be paid for hours worked <br />based on the hourly rates provided below in accordance with Section 6 (Compensation) <br />of the Agreement. <br />Table 2. Total project Not-To-Exceed Fee Schedule, including Consultant hourly rates and <br />estimated hours for Part A and Part B <br />Sr. Vert ical <br />Transport at ion <br />Consult ant <br />Principal in <br />Charge <br />Consultant <br />(Reviewer) <br />Project <br />Engineer <br />(1 of 2) <br />Project <br />Engineer <br />(2 of 2)Designer <br />375.00$ 300.00$ 240.00$ 220.00$ 220.00$200.00$ <br />Part Phase Subtotal Hours:Hours:Hours:Hours:Hours:Hours: <br />1. Initial Assessment <br />& Report 7,500.00$ 20 <br />2. Construction <br />Documents 6,000.00$ 16 <br />3. Bidding Assistance 9,375.00$ 25 <br />4. Construction <br />Phase Services 16,875.00$ 45 <br />39,750.00$ 106 0 0 0 0 0 <br />1. Construction <br />Documents 38,720.00$ 8 8 80 40 40 <br />2. Bidding Services 5,160.00$ 4 18 <br />3. Construction <br />Phase Services 14,960.00$ 10 4 50 <br />58,840.00$ 0 22 12 130 58 40 <br />Tot al Project Not -To-Exceed:98,590.00$ <br />Part B Subt ot al : <br />A. Elevator <br />Modernizat ion <br />B. Garage <br />Repair <br />Part A Subt ot al : <br />Ti tles: <br />Hourly Rat es: <br />These fees do not include testing and special inspections. Concrete probing, drilling, <br />coring, planter dirt removal, and concrete laboratory testing if required shall be performed <br />by third party. Any coordination work the City Engineer, or their designated representative <br />may require from Consultant related to testing and special inspections, and any site visits <br />not already described and included in the Scope of Services in this Exhibit A, may be <br />requested by the City Engineer or their designated representative as an additional service <br />and will be billed at the rates outlined in the Fee Schedule presented in Table 2 above. <br />ATTY/AGR.2026.052/Walker Consultants (Garage Repair Engineering Services) (Page 18 of 18)
The URL can be used to link to this page
Your browser does not support the video tag.