My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2026.04.13 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2026
>
Agda Pkt 2026.04.13 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:57:15 AM
Creation date
4/14/2026 10:51:29 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
4/13/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
708
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> PART II, Page | 31 <br /> <br />Section 1: Project Need (Percent of Total Value: 20%) <br />Within this section, address the criteria that defines the Project Need rating factor (see <br />table below) in a cohesive, comprehensive, and concise narrative format. <br /> <br />Project Need: The applicant described a need that is pertinent to the intent of the grant. <br />The elements that comprise this Rating Factor are listed below. Addressing each <br />element does not in itself merit a high rating; although each element is to be addressed <br />(when applicable), it is the quality of the response to each t hat will be evaluated. The <br />response will be evaluated with a single rating based on a scale of 0-5. <br />1.1 Demonstrate how the need(s) are related to the intent of Proposition 64. <br />1.2 Demonstrate how the need(s) are related to the selected Project Purpose <br />Areas. <br />1.3 Describe local service gaps that contribute to the need for the proposed Prop <br />64 project are identified. <br />1.4 Provide relevant local qualitative and/or quantitative data with citations in <br />support of the Prop 64 project need(s). <br />1.5 Describe the process that was used to determine the need(s), including <br />soliciting input from key stakeholders (e.g., community, public, private). <br /> <br /> <br />7.C. - Page 39 of 101 <br />98
The URL can be used to link to this page
Your browser does not support the video tag.