My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Schaaf and Wheeler Consulting Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Schaaf and Wheeler Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 4:09:26 PM
Creation date
5/1/2026 4:09:19 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Redwood Creek Bank Stabilization Near 707 Bradford
RMP File Number
304
Date
4/30/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 04-02-26 VR <br />EXHIBIT “A” <br />SCOPE OF SERVICES AND FEE <br />Task 1. Project Management, up to $8,420 Time and Materials (T&M) <br />Consultant shall provide for the overall management of the project. This task includes: <br />A. Schaaf and Wheeler will schedule and attend a formal project kick-of meeting with <br />the City following a Notice to Proceed. At this meeting, the City’s goals will be <br />discussed to ensure that proposed work meets City’s standards and to identify <br />known issues and concerns. Schedule as well as budget management and <br />tracking will be also discussed at this meeting. <br />B. Schaaf and Wheeler will provide management and internal QA/QC-Quality <br />Assurance and Quality Control design reviews for the duration of the project, <br />including attendance at three design review meetings and routine coordination with <br />the City. <br />C. Submittals of monthly invoices to the City with backup documentation. <br />Deliverables: digital copies of meeting agendas and meeting minutes. <br />Task 2. Document Collection and Planning, up to $6,420 Time and Materials (T&M) <br />Consultant shall provide the data needed to address key data gaps to complete <br />necessary tasks required for engineering design, and environmental permitting in this <br />project. This task includes: <br />A. Schaaf and Wheeler to compile and review all available information provided by <br />the City and other sources, including existing conditions information, library <br />photographic records, maintenance reports, record drawings/as-builts, and utility <br />mapping. <br />B. Schaaf and Wheeler to review the Bradford Bank Stabilization, Alternative Analysis <br />Report (October 24, 2025) and incorporate its findings into the design. <br />Deliverables: a concise list of data reviewed and an organized digital of project reference <br />files for the City. and the project team <br />Task 3. Surveying Services and Geotechnical Investigation, up to $34,855 Time and <br />Materials (T&M) <br />Consultant shall provide the surveying and geotechnical information needed to complete <br />engineering design in this project. This task includes: <br />ATTY/AGR.2026.093/Schaaf & Wheeler Consulting Civil Engineers(Redwood Creek Bank Stabilization Near 707 Bradford) (Page 11 of 21)
The URL can be used to link to this page
Your browser does not support the video tag.