My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Schaaf and Wheeler Consulting Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Schaaf and Wheeler Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 4:09:26 PM
Creation date
5/1/2026 4:09:19 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Redwood Creek Bank Stabilization Near 707 Bradford
RMP File Number
304
Date
4/30/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 04-02-26 VR <br />Cornerstone Earh Group (Geotechnical Engineering) <br />Professional Staff Hourly <br />Rate ($) <br />Construction and <br />Support Staff <br />Hourly <br />Rate ($) <br />Staff $207 Administrative Assistant $125 <br />Senior Staff $227 Engineering Technician I $207 <br />Project Manager $250 Construction Services <br />Administrative <br />$160 <br />Senior Project <br />Manager <br />$273 Engineering Technician II $207 <br />Principal $315 Technical Illustrator $180 <br />Senior Principal $350 Supervisory Technician $207 <br />(blank space)Senior Supervisory <br />Technician <br />$210 <br />Professional Technical Staff includes Engineers, Geologists, Hydrogeologists, Chemists, <br />and Scientists. Charges for personnel will be made in accordance with the above rates. <br />For field personnel, regular rates are normal workday construction hours (Monday <br />through Friday). For time spent over 8 hours in a day, time spent after 5 P.M., time spent <br />on swing shifts, and time spent on Saturdays by field personnel, overtime rates will be <br />charged at 1.5 times the hourly rate. Work on Sundays and holidays and work in excess <br />of 12 hours in one day will be charged at 2.0 times the hourly rate. Field rates are based <br />on a 48-hour notice. For less than 48-hour notice, a 10 percent surcharge will be added. <br />All field personnel, vehicle and equipment charges are portal to portal. Reproduction of <br />project documents will be charged as a project expense. <br />Equipment Charges <br />Vehicle <br />Nuclear Density Gauge <br />$35 per hour <br />$13 per test <br />GPS Unit <br />Hand Auger <br />Equipment Dust <br />Meter (3) <br />$100 per day <br />$100 per day <br />$475 per day, $1,475 per week, $4,125 per month, cellular connectivity $515 per month <br />per <br />meter <br />PID ppmv / 4 Gas <br />Meter PID ppbv <br />$140 per day, $600 per week, $2,000 per month <br />$180 per day, $650 per week, $2,200 per month <br />Weather <br />Station <br />Benkelman <br />Beam <br />Double Ring <br />Infiltrometer Dynamic <br />Cone <br />Pressure / Velocity Gauge <br />$100 per day, $250 per week, $740 per month <br />$175 per day, $750 per week, $2,800 per month <br />$100 per day <br />$100 per day <br />$90 per day, $300 per week, $600 per month <br />VIMS Blower <br />Equipment Depth <br />Sounder <br />ADMP Monitoring Kit <br />(1) Liner and Two <br />Caps Core N One <br />Sampler <br />$350 per day <br />$50 per day <br />$150 per day, $360 per week, $840 per month <br />$12 each <br />$50 each triplicate sample <br />ATTY/AGR.2026.093/Schaaf & Wheeler Consulting Civil Engineers(Redwood Creek Bank Stabilization Near 707 Bradford) (Page 19 of 21)
The URL can be used to link to this page
Your browser does not support the video tag.