Laserfiche WebLink
REV: 04-02-26 VR <br />Modeling <br />Software Drone <br />$25 per hour <br />$250 per day <br />Geotechnical Laboratory Tests <br />Tests Run <br />During <br />Normal <br />Workday Hours <br />Tests Run Outside <br />Workday Hours <br />Compaction Curve <br />Compaction Check <br />Point Plasticity Index <br />$370 each <br />$190 each <br />$270 each <br />$555 each <br />$285 each <br />$405 each <br />Sieve/Hydrometer <br />Moisture Content <br />$270 each <br />$10 each <br />$408 each <br />$12 each <br />Moisture/Density <br />- #200 Wash <br />Sieve < ¾ inch Liner (small) <br />Sieve > ¾ inch Bucket <br />(Large) Lime Stability <br />Consolidation <br />Soil Corrosion Testing <br />$35 each <br />$70 each <br />$150 each <br />$225 each <br />$400 each <br />$450 each <br />$250 each <br />$53 each <br />$80 each <br />$225 each <br />$330 each <br />$600 each <br />$375 each <br />Direct Expenses (Cornerstone Earth Group): <br />Reimbursement for the direct expenses listed below incurred in connection with the Work <br />will be billed at cost plus 18 percent: <br />1) Drillers, utility locators, laboratories, contractors, hygienists, and consultants. <br />2) Rented vehicles, public transportation, tolls, and air flights. <br />3) Permits and special fees, insurances and licenses required to perform Work. <br />4) Computer programs and rented field equipment. <br />5) Large volume copying of project documents. <br />6) Maps, photographs, and environmental databases. <br />7) Overnight or same day delivery charges. <br />8) Copying or production of over-sized figures and plans. <br />Cornerstone will hold samples collected during the performance of the Work no longer <br />than thirty (30) calendar days after their date of collection; project samples requested to <br />be held greater than thirty (30) calendar days will be billed at $100 per ever ninety (90) <br />calendar days. <br />Hourly Rates for Kier+Wright (Surveying) <br />Position Hourly Rate ($) <br />Principal $345 <br />Development Services Manager $335 <br />Associate $300 <br />Senior Engineering Manager $280 <br />Structural Engineering Manager $273 <br />Technical Manager (SME)/Senior <br />Engineering Manager <br />$273 <br />Senior Engineer $265 <br />Engineer III $240 <br />ATTY/AGR.2026.093/Schaaf & Wheeler Consulting Civil Engineers(Redwood Creek Bank Stabilization Near 707 Bradford) (Page 20 of 21)