My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Schaaf and Wheeler Consulting Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Schaaf and Wheeler Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 4:09:26 PM
Creation date
5/1/2026 4:09:19 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Redwood Creek Bank Stabilization Near 707 Bradford
RMP File Number
304
Date
4/30/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 04-02-26 VR <br />Modeling <br />Software Drone <br />$25 per hour <br />$250 per day <br />Geotechnical Laboratory Tests <br />Tests Run <br />During <br />Normal <br />Workday Hours <br />Tests Run Outside <br />Workday Hours <br />Compaction Curve <br />Compaction Check <br />Point Plasticity Index <br />$370 each <br />$190 each <br />$270 each <br />$555 each <br />$285 each <br />$405 each <br />Sieve/Hydrometer <br />Moisture Content <br />$270 each <br />$10 each <br />$408 each <br />$12 each <br />Moisture/Density <br />- #200 Wash <br />Sieve < ¾ inch Liner (small) <br />Sieve > ¾ inch Bucket <br />(Large) Lime Stability <br />Consolidation <br />Soil Corrosion Testing <br />$35 each <br />$70 each <br />$150 each <br />$225 each <br />$400 each <br />$450 each <br />$250 each <br />$53 each <br />$80 each <br />$225 each <br />$330 each <br />$600 each <br />$375 each <br />Direct Expenses (Cornerstone Earth Group): <br />Reimbursement for the direct expenses listed below incurred in connection with the Work <br />will be billed at cost plus 18 percent: <br />1) Drillers, utility locators, laboratories, contractors, hygienists, and consultants. <br />2) Rented vehicles, public transportation, tolls, and air flights. <br />3) Permits and special fees, insurances and licenses required to perform Work. <br />4) Computer programs and rented field equipment. <br />5) Large volume copying of project documents. <br />6) Maps, photographs, and environmental databases. <br />7) Overnight or same day delivery charges. <br />8) Copying or production of over-sized figures and plans. <br />Cornerstone will hold samples collected during the performance of the Work no longer <br />than thirty (30) calendar days after their date of collection; project samples requested to <br />be held greater than thirty (30) calendar days will be billed at $100 per ever ninety (90) <br />calendar days. <br />Hourly Rates for Kier+Wright (Surveying) <br />Position Hourly Rate ($) <br />Principal $345 <br />Development Services Manager $335 <br />Associate $300 <br />Senior Engineering Manager $280 <br />Structural Engineering Manager $273 <br />Technical Manager (SME)/Senior <br />Engineering Manager <br />$273 <br />Senior Engineer $265 <br />Engineer III $240 <br />ATTY/AGR.2026.093/Schaaf & Wheeler Consulting Civil Engineers(Redwood Creek Bank Stabilization Near 707 Bradford) (Page 20 of 21)
The URL can be used to link to this page
Your browser does not support the video tag.