Laserfiche WebLink
REV: 04-02-26 VR <br />Engineer II $208 <br />Engineer I $172 <br />Engineering Tech III $219 <br />Engineering Tech II $199 <br />Engineering Tech I $161 <br />Project Coordinator IV $175 <br />Project Coordinator III $160 <br />Project Coordinator II $145 <br />Project Coordinator I $132 <br />Senior Land Surveyor $266 <br />Senior Survey Construction Manager $266 <br />Survey Coordinator $240 <br />Project Surveyor III $238 <br />Project Surveyor II $193 <br />Project Surveyor I $165 <br />Draftsman/Survey Tech III $186 <br />Draftsman/Survey Tech II $159 <br />Draftsman/Survey Tech I $138 <br />3D Laser Scanning Crew $462 <br />3-Man Survey Crew $493 <br />2-Man Survey Crew $388 <br />1-Man Survey Crew $240 <br />Engineering/Survey Intern $105 <br />Testimony (Trial or Deposition)$625 <br />All blueprint and reproduction will be billed at cost plus 10%. Time spent for preparation <br />for testimony will be billed in accordance with the above hourly rates. <br />ATTY/AGR.2026.093/Schaaf & Wheeler Consulting Civil Engineers(Redwood Creek Bank Stabilization Near 707 Bradford) (Page 21 of 21)