My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ghirardelli Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ghirardelli Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2026 11:05:59 AM
Creation date
5/22/2026 11:05:54 AM
Metadata
Fields
Template:
Agreement
PROJECT NAME
On-call Construction Management and Inspection Services
RMP File Number
304
Date
5/8/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 04-17-26 VR <br />EXHIBIT “A” <br />SCOPE OF SERVICES AND FEE <br />Introduction <br />Consultant is being selected to provide Construction Management & Inspection Services to the <br />City to support the City’s upcoming Pavement Program projects. The following Scope of Work <br />serves as a Primary Scope of Work that the Consultant shall provide as Task Order assignments <br />are executed. When a Task Order is requested by the City Director of Engineering or designee, <br />the Consultant shall prepare a specific Task Order – Scope of Work. <br />Task 1 – Plans, Specifications, & Estimate (PS&E) Constructability Review <br />Consultant shall provide PS&E review services as assigned by the City Director of Engineering or <br />designee for pavement program projects. PS&E packages will typically be prepared by the City <br />Engineering and Transportation Department or outside consultant team. Consultant shall <br />participate in the PS&E development process during the 65%, 95%, and 100% Bid Set review <br />process to validate constructability of the project as proposed by the project designer. <br />Consultant review shall focus on construction methods proposed for pavement rehabilitation, <br />construction staging activities, and identification of cost savings construction methodologies. <br />As part of the PS&E review, Consultant shall conduct field investigations to verify proposed <br />construction methodologies, identification of additional civil improvements to comply with <br />American with Disabilities Act (ADA) conformance, drainage stability, and necessary sidewalk or <br />curb & gutter improvements. <br />PS&E package review shall also include review of Technical Specifications and Engineer Estimates <br />to validate project budgets. <br />Task 1 Deliverables: <br />Consultant shall provide red line PS&E comments and memorandum outlining <br />recommendations to improve PS&E packages prior to release for bid. <br />Task 2 – Construction Management <br />Consultant shall aid the City Engineering and Transportation Department in managing all <br />construction related activities specific to the implementation of the upcoming Pavement <br />Program projects with the first phase in 2026-2027. Consultant shall be responsible for, but not <br />limited to, the following activities: <br />Review and recommendation of approval of contractor submittals <br />Preparation of pre-construction and Kick Off meeting materials including agenda, note <br />taking, and Action Item tracking <br />Review and recommendation of approval of contractor’s Monthly Payment Quantities <br />for project invoicing <br />ATTY/AGR.2026.109/Ghirardelli (Construction Management Support-Pavemenet Program) (Page 11 of 16)
The URL can be used to link to this page
Your browser does not support the video tag.