Laserfiche WebLink
Economic & Planning Systems, Inc. A-3 Appendix A <br />Table A-4. Permanent Loan Financing Assumptions <br />Permanent Loan $18,197,125 <br />Interest rate 5.85% <br />Term Yrs 40 <br />Table A-5. Tax Credit Calculation <br />Tax Credit Calculation In QCT/ DDA Outside QCT/DDA <br />Hard Costs $54,540,000 $54,540,000 <br />Soft Costs $13,635,000 $13,635,000 <br />Eligible Basis $68,175,000 $68,175,000 <br />QCT/ DDA Boost1 130% 0% <br />Adjusted Eligible Basis $88,627,500 $68,175,000 <br />Applicable Fraction2 100% 100% <br />Qualified Basis $88,627,500 $68,175,000 <br />Tax Credit Rate 4% 4% <br />Annual Tax Credit $3,545,100 $2,727,000 <br />x 10 years 10 10 <br />Total Tax Credit $35,451,000 $27,270,000 <br />Tax Credit Pricing3 $0.90 $0.90 <br />Investor Equity $31,728,645 $24,406,650 <br />1 Model assumes the project is not located in a Qualified Census Tract (QCT) or Difficult Development Area (DDA). <br />Projects located in a QCT or DDA may be eligible for up to a 30 percent basis boost, which increases the eligible <br />basis used to calculate Low-Income Housing Tax Credits and can increase available tax credit equity. <br />2 Applicable fraction reflects the share of the project treated as income-restricted affordable housing for tax credit <br />purposes. The model assumes a 100 percent applicable fraction, meaning all residential units are assumed to be <br />rent-restricted and occupied by income-qualified households, so the full eligible residential basis is included in the <br />tax credit calculation. <br />3 Estimated based on Q4 2025 tax credit pricing <br />Table A-6. Developer Fee Calculation <br />Developer Fee <br />Unadjusted eligible basis $65,675,000 $65,675,000 <br />Maximum Percent 1 15% 15% <br />Maximum Developer Fee $9,851,250 $9,851,250 <br />Take Home Developer Fee 2 $2,500,000 $2,500,000 <br />Contributed/ Deferred Developer Fee $7,351,250 $7,351,250 <br />1 Reflects the assumed 4% LIHTC developer fee limit, calculated as 15 percent of unadjusted eligible basis. <br />2 Take-home developer fee is capped at $2.5 million. Any developer fee above this amount is assumed to be deferred <br />or contributed back to the project as equity. <br />In QCT/ DDA Outside QCT/DDA <br />8.A. - Page 112 of 168 <br />122