My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2026.07.13 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2026
>
Agda Pkt 2026.07.13 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2026 3:24:28 PM
Creation date
7/14/2026 3:18:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
7/13/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Standard OSI Rev 12/2013 <br /> <br />(f) Exclusive Track Occupancy: This refers to a method, such as those above, of <br />establishing working limits on controlled track in which movement authority of <br />trains and other equipment is withheld by the Control Operator or Train <br />Dispatcher or restricted by a Flagman. <br /> <br />F. Work Plan (WP): A document submitted by the Contractor detailing the activities <br />associated with a particular element of work. The Work Plan must include a description <br />of the activity as well as the number of men and a list of the equipment required in the <br />performance of the activity. <br />G. Site Specific Work Plan (SSWP): A program, plan, and schedule prepared and submitted <br />by the Contractor three weeks prior to the proposed work and approved by the Engineer <br />that accurately describes and illustrates the manner in which Work within the Operating <br />Envelope will be accomplished, the impacts on any elements of the Operating System and <br />the manner in which Work will be accomplished with the allotted Work Windows or <br />protected period. <br />H. Engineer/Project Manager: Caltrain Engineer/Project Manager or other authorized <br />representative. <br /> <br />1.03 WORK PLAN (WP) <br /> <br />A. The Contractor will prepare a detailed Work Plan for each and every task associated with <br />the work that is required by the Contract or any associated Field Instructions or Change <br />Notices. The Caltrain Project Manager will provide directions and assistance to the <br />Contractor in the preparation and submittal of the Work Plan. <br /> <br />B. WP’s shall include all activities necessary to perform construction tasks within the PCJPB <br />Right of Way, including use of stations, sidings, temporary construction easements and <br />proposed storage areas. <br /> <br />C. WP’s shall include a description of any proposed changes to the Operating System <br />between start and finish of the work, including any requested Work Windows. <br /> <br />D. The WP shall conform to all other requirements applicable to the Contract Documents. <br /> <br />E. The WP must contain a basic schedule of the work showing each activity and where and <br />how it affects normal operation of the Operating System. Each activity in the plan shall <br />include all labor, materials and equipment required to complete the activity within the <br />PCJPB allotted time period. <br />ATTY/AGR.2026.195/JPB License - Recycled Water at Beech (REV: 07-09-26 VR) (Page 23 of 29) <br />7.G. - Page 39 of 104 <br />137