Laserfiche WebLink
Page 2 of 18 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />jurisdictions to streamline project approvals, increase permitted residential density and provide <br />exemptions from certain environmental review requirements under the California Environmental Quality <br />Act (CEQA). <br />Consistent with this broader legislative trend, Senate Bill 79 (the Abundant & Affordable Homes Near <br />Transit Act)1 became effective on July 1, 2026. SB 79 aims to increase housing availability and affordability <br />near transit stations. Specifically, SB 79 requires housing to be allowed by right on sites zoned for <br />residential, mixed-use, or commercial uses if the site is located within 0.5 miles of a qualifying transit stop <br />and it meets certain criteria, including provision of affordable units and compliance with various labor <br />requirements. Further, it establishes standards for height, density, and floor area ratio which may <br />supersede local standards, depending on location. <br />SB 79 does not make projects eligible for ministerial review2 nor does it amend or otherwise affect CEQA <br />requirements. As such, proposed SB 79 housing developments may be processed through local <br />jurisdictions’ standard review process and must undergo CEQA review.3 <br />SB 79 Baseline Development Standard Obligations <br />SB 79 establishes development standards for height, density, and floor area ratio for qualifying housing <br />projects located within 0.5 mile of a qualifying transit-oriented development stop4. The allowed project <br />height and density are determined by two factors: <br />1.The level of transit service provided at the qualifying transit stop, and; <br />2.A site’s distance from a designated pedestrian access point at that transit stop. <br />Under SB 79, qualifying transit stops are categorized into two tiers5 based on the frequency and type of <br />transit service provided. Redwood City contains one qualifying Tier 1 transit stop (the Redwood City <br />Caltrain Station) and does not have any Tier 2 stops. The law further provides distinct development <br />standards for projects within varying distances from the transit stop’s pedestrian access points: within <br />200 feet, within 0.25 miles, and within 0.5 miles. The required development standards for each “zone” <br />are summarized in Table 1. The zones around the Redwood City Caltrain Station are depicted in Figure 1. <br />1 Government Code Section 65912.155 <br />2 Projects subject to ministerial review are approved at an administrative level, involve little or no discretion by the <br />review authority, and are not subject to environmental review under CEQA. <br />3 SB 79 projects may qualify for review pursuant to other state laws that provide for streamlined approval or CEQA <br />processes concurrently (e.g. SB 35 or SB 423). <br />4 “Transit-oriented development stop” is defined in Government Code Section 65912.156 (p). <br />5 “Tier 1 TOD Stop” means a TOD stop within an urban transit county that is served by heavy rail transit or very <br />high-frequency commuter rail; “Tier 2 TOD stop” means a TOD stop within an urban transit county (excluding a <br />Tier 1 TOD stop) served by light rail transit, by high-frequency commuter rail, or by bus rapid transit (as defined in <br />Public Resources Code Section 21060.2(a)(1)). An “urban transit county” means a county with more than 15 <br />passenger rail stations. For the Bay Area this includes the counties of San Francisco, San Mateo, Santa Clara, and <br />Alameda. Applicable transit stops include BART, Caltrain, Muni Metro, VTA light rail stops, and AC Transit/Muni bus <br />rapid transit stops. <br />8.A. - Page 2 of 97 <br />220