My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2026.07.13 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2026
>
Agda Pkt 2026.07.13 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2026 3:24:28 PM
Creation date
7/14/2026 3:18:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
7/13/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 3 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />City’s Cost-Share Sidewalk Replacement Program and replacing asphalt in the City’s right-of-way following <br />utility trench repairs. These types of projects are considered Public Works Projects per the City’s Municipal <br />Code but are smaller in scale and require contractors to perform specific kinds of repetitive work. <br />Given the recurring nature of this work, having a contractor capable of performing tasks on an as-needed <br />basis allows the City to meet its obligations in the most cost-effective and time-efficient manner. Section <br />2.64 of Article VII in Chapter 2 of the City’s Municipal Code authorizes formal and informal procurement <br />of on-call construction work with specific guidelines based on the projected value of the contract. <br />On April 28, 2026, staff issued a Notice Inviting Bids (NIB). The NIB was also advertised in the San Mateo <br />Daily Journal and posted on the City’s website. Staff also notified multiple prospective bidders of the <br />solicitation. Three bidders attended the mandatory pre-bid meeting, and one bid was received by the May <br />27, 2026 submission deadline. <br />ANALYSIS <br />Bidders were provided estimated annual quantities for various job tasks and asked to provide unit prices <br />and extended prices for the purpose of determining the lowest bid. <br />The City received one bid from Bay Area Paving Co. (BAP) with a Total Bid Price of $1,082,744. BAP is the <br />lowest responsive and responsible bidder. The Total Bid Price is higher than the recommended contract <br />award amount due to the total estimated quantities provided by the City for bid comparison purposes. <br />The City has no obligation to establish and purchase mandatory minimum quantities under this contract, <br />and bidders were made aware of this during the bidding process. The recommended not-to-exceed <br />contract amount has been capped at $800,000 to align with forecasted funding available in the respective <br />divisions’ operating budgets for the one-year contract period. <br />Staff recommends approval and authorization for the City Manager to execute the contract documents <br />and award the standard form contract for the On-Call Concrete or Asphalt Repair and Replacement Project <br />to Bay Area Paving Co. in an amount not to exceed $800,000. <br />EQUITY IMPACT STATEMENT <br />All City actions are assessed for impact. Because this item is on the consent calendar, this section indicates <br />assessment process, not findings. The anticipated impact of this policy, program, or action has not been <br />assessed because relevant data is not currently available. <br />FISCAL IMPACT <br />There is no impact from the General Fund. Funding will be allocated from the operating budgets of <br />multiple divisions within PWS on an as-needed basis during the contract term. <br />7.E. - Page 2 of 3 <br />77
The URL can be used to link to this page
Your browser does not support the video tag.