My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 West Yost Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 West Yost Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2010 10:10:01 AM
Creation date
3/8/2010 12:32:02 PM
Metadata
Fields
Template:
Agreement
Contractor Name
West Yost Associates
PROJECT NAME
Water Master Planning
RMP File Number
304
Date
2/24/2010
MO Ref
10-013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. Action items. <br /> <br />WY A will also conduct technical progress meetings, as noted and budgeted in subsequent technical tasks, <br />to present interim work products and discuss Project issues. These meetings will focus on obtaining input <br />from the City on its review of completed Draft Chapter work products. <br /> <br />TASK 1.3 INTERNAL QUALITY ASSURANCE/QUALITY CONTROL <br /> <br />As part of each technical task, WY A prov~des internal quality assurance and quality control for each of the <br />project deliverables prior to submission to the City. These reviews are budgeted as part of technical task <br />work. <br /> <br />Task 1 Work Products: <br /> <br />. Meeting agendas and minutes from meetings and conference calls <br /> <br />. Monthly status reports, monthly invoices and project schedule <br /> <br />. Kickoff workshop presentation materials. <br /> <br />Task 1 Assumptions: <br /> <br />. Budgeting assumes kickoff meeting, 3 face-to-face meetings, and 8 progress conference calls. <br /> <br />Task 2 Preliminary Research and System Review <br /> <br />Objective: Evaluate and review available information on the existing water system that defines its <br />capabilities and condition. <br /> <br />Work Tasks: <br /> <br />TASK 2.1 REVIEW AVAILABLE DATA <br /> <br />WY A will review available materials and supplement or update these materials as needed to gain a better <br />and more complete understanding of the major facilities in the City's water system, the basic operation of <br />the water system, existing facility status, demands, and demand trends. This work will include working <br />with City staff to identify and collect information, studies, reports, designs and operational data. This <br />information includes but is not limited to: <br /> <br />. "To scale" water distribution system mapping information including system schematic diagram, <br />distribution system map with pressure zones defined, atlas maps and distribution system <br />information in ESRI ArcGIS format including a parcel level base map with latest revisions, <br />identifying: <br /> <br />o Pipeline diameters, hydrants and valves <br /> <br />o Locations of pump stations, reservoirs, pressure reducing stations, and pressure <br />zone/adjoining system interties <br /> <br />o Location of all interties/turnouts to the SFPUC water system <br /> <br />o Location of all interties/turnouts to the City of Menlo Park, Belmont County Water <br />District and California Water Service Company's water system <br /> <br />October 22, 2009 <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.