Laserfiche WebLink
<br />. <br /> <br />. Measure the pipe thickness using a digital ultrasonic thickness gauge <br />The measurements will be reported with the percent metal loss and corrosion rate for each section. <br /> <br />4. Letter Report - Prepare a letter report with the results of the in-situ pipe evaluation and metal loss <br />and corrosion measurements. Tabulate the data collected by the City and V&A. Provide graphs of <br />the data and test results for interpretation and analysis. Evaluate the correlation between external <br />corrosion rate and pipe age, soU resistivity and chemical analysis of the backfill. Discuss the results <br />of the testing, conclusions obtained from the evaluation, estimate the remaining useful life of the <br />pipelines, degree of tuberculation and provide recommendations for corrosion control or <br />rehabifitation of the cast iron pipelines. <br /> <br />5. Technical Assistance - V&A has estimated 16 hours of unallocated technical assistance to be used <br />as requested by the City. Time spent over 16 hours wlll be invoiced on a time and materials basis at <br />the rates shown on the attached resource allocation estimate. <br /> <br />We propose to complete this work on a time and materials basis at a total cost not to exceed $21,400 with <br />terms of net 30 days. This fee Is valid for 90 days from the date of this proposal. The scope of work was <br />developed as a result of our discussion and represents our mutual understanding. Estimated costs for the <br />above project scope are itemized in the attached Resource Allocation Estlmate. These costs represent our <br />best estimate at this time and may change subject to future developments during the project. It is possible <br />that some of the estimated manpower requirements for specific task items may increase while others may <br />not require the entire anticipated effort. This provides us a greater degree of confidence in the overall project <br />estimate, rather than in any given particular task. If unforeseen circumstances should arise which indicate <br />that more time is required, V&A will provide a written estimate of additional required time and cost. V&A will <br />not proceed with work beyond the not to exceed figure without a written authorization from your office. <br />Charges to this project will be made for actual time spent on the project and will be charged as per the <br />attached Fee Schedule. We request that you carefully review this proposal to assure full understanding of <br />the scope of the work. Our Fee Schedule Is adjusted annually in January. Fees will be adjusted at that time <br />and a new Fee Sch~dule will be sent. Charges on the remainder of the project will be based on the new <br />schedule. <br /> <br />V&A appreciates the opportunity to provide this proposal to the City of Redwood City and looks forward to <br />assisting with this project. Please contact V&A with any questions or for additional Information. <br /> <br />Sincerely, <br /> <br />/Ji~./~ <br /> <br />Keith A. Packard, P.E. <br />Project Manager <br />V&A Consulting Engineers <br /> <br />~V&A <br />h...~ <br /> <br />Accepted: <br /> <br />Date: <br /> <br />City of Redwood City, CA <br /> <br />Page 2 of 3 <br />