Laserfiche WebLink
<br />I '. <br /> <br />RESOURCE ALLOCATION ESTIMATE <br /> <br />PROPOSAL NO: 09-269R1 / <br /> <br />Date: <br /> <br />/" <br />5-Mar-1 0 <br /> <br />CLIENT: City of Redwood City, CA <br /> <br />JOB TITLE: Cast Iron Water Pipeline Evaluation During Installation of SFPUC BO Pipeline No.5 <br /> <br />Task Description Prlncipal- Project Assistant CADD Project T otaI <br />In-Charge Manager Engineer Designer Administrator <br /> Document Review 2 2 4 <br />2 In-Situ Pipe Evaluation 4 8 12 <br />3 Metal Loss and Corrosion Measurements 2 40 42 <br />4 Letter Report 2 10 30 2 44 <br />5 Technical Assistance 8 8 16 <br /> Subtotal 2 26 86 0 4 118 <br /> Hourly $256 $194 $118 $118 $72 <br /> Total DIrect Labor $512 $5,044 $10,148 $0 $288 $15,992 <br /> Other Direct Costs Amount <br /> UT Measurement Gauge $70 per Day 6 Days $420 <br /> Truck $80 per Day 6 Days $480 <br /> Mileage $0.50 per Mile 320 Miles $160 <br /> Soil Analysis (Billed at Cost + 10%) $180 per Sample 23 Samples $4,140 <br /> Office Expenses/Printing/Reproduction $208 <br /> Subtotal Other Direct Costs $5,408 <br /> GRAND TOTAL ESTIMATED COST $21,400 I <br /> <br />Page 3 of3 <br />