My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2010 10:43:57 AM
Creation date
4/9/2010 9:05:31 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Seaport Centre Maintenance District-Conditions Report Civil Engineering Services
RMP File Number
304.5
Date
4/6/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I~ <br />11_' <br />Bkf <br /> <br />APPROACH <br /> <br />EXHIBIT A - SCOPE OF WORK <br /> <br />Exclusions <br /> <br />The following are excluded from BKF's scope of services: <br /> <br />Work beyond the deadline schedule. We understand the schedule is relatively short and <br />have budgeted for services only through the end of the tentative schedule. Should the <br />deadline be extended, any work beyond the tentative schedule deadline can be provided as <br />an additional service. <br /> <br />Major revisions to work or drawings that are substantially complete, provided such <br />revisions are not caused by the actions ofBKF are excluded. <br /> <br />Geotechnical Engineering services, utility potholing, and environmental reviews are <br />excluded .from this Scope of Services. <br /> <br />The City will provide any required site access clearance. BKF will provide necessary <br />project coordination, however we expect to work with the City to identify the correct <br />contact personnel on..site and obtain keys, etc. <br /> <br />Preliminary engineering plans are excluded. Exhibits and design will be limited to <br />schematic and conceptual level for the purposes of including in the report and calculating <br />an engineer's opinion of probable construction cost. <br /> <br />Locating property lines, right..of-way, or easement areas are excluded. Land and easement <br />acquisition services are excluded from this scope of services. <br /> <br />Permit coordination and costs including California Water Quality Control Board, <br />CalifomiaDepartnlent ofFish and Game and United States Army Corps of Engineers. <br /> <br />Levee crest elevation certification is excluded. <br /> <br />Any services not specifically included in the Scope of Services are excluded. <br /> <br />'~-".-.,...' -City of Red~ioo<fciiy-:.'seaport"ce;;ire..Mainlenance'6isirfCi':.condiiion's.Repo'ji-m..- .....-.-......--...-....-....-.-.-.-----.-.-.....-...-..-650.482-:--6300 <br />Date: February 5. 2010 (revised 2/19/2010) wv/W.bkf.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.