My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Ferma Corporation
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Ferma Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2010 11:27:32 AM
Creation date
4/9/2010 11:24:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Ferma Corporation
PROJECT NAME
Site Demolition at 1402 Maple Street, Redwood City
RMP File Number
304
Date
3/22/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of Redwood City <br />1402 Maple St., Redwood City <br />Demolition Quotation <br /> <br />February 26,2010 <br />09-0865-0l.RI <br />Page 2 <br /> <br />Exclusions Continued: <br />Well capping <br />Off-site work (city sidewalks, curb cuts, driveway approaches, trees, etc.) <br />Vibration and/or subsidence prevention <br />Backfil1/ compaction <br />Storm Water Run Off Plan or installation/maintenance <br />Removal of common perimeter fencing <br />Patchwork or repair work <br />Second mobilization for each piece of equipment <br /> <br />Ferma Corporation proposes to perform the above-described work for as follows: <br /> <br />Item No.1 - Outside of the Fence $ 8,230.00 <br /> <br />Item No.2-Inside of the Fence $17,180.00 <br /> <br />Total bid price: $ 26,010.00 <br /> <br />Pro;ect Schedule: <br />Ten work days <br /> <br />Pavment Schedule: <br />Payments on account shall be due and payable within twenty (20) days after the date of the invoice for all <br />acceptable work completed each month (no retention). <br /> <br />Qualifications: <br />· Notificat~on of utility companies regarding disconnect of service and meter by others <br />Site shall be left rough graded with all concrete, masonry, asphalt, debris, roots, etc. in excess of 3" cross- <br />section removed <br />Stand-by time may be incurred for sitting machines if work stoppage occurs due to non-Ferma related <br />causes. <br />Additional mobilization, if required, will be charged at $2,500.00 each occurrence <br />Ferma Corporation excludes "All Risk!Builder's Risk" insurance coverage <br />Indemnity and hold harmless clauses to be mutually agreed upon <br />Ferma Corporation meets/exceeds State of California recycling requirements <br /> <br />Please do not hesitate to call our office if you have any questions. <br /> <br />Sincerely, <br /> <br />Fenna Corporation <br /> <br />~~ <br /> <br />MF:rrl <br />
The URL can be used to link to this page
Your browser does not support the video tag.