Laserfiche WebLink
<br />City of Redwood City <br />1402 Maple St., Redwood City <br />Demolition Quotation <br /> <br />February 26,2010 <br />09-0865-0l.RI <br />Page 2 <br /> <br />Exclusions Continued: <br />Well capping <br />Off-site work (city sidewalks, curb cuts, driveway approaches, trees, etc.) <br />Vibration and/or subsidence prevention <br />Backfil1/ compaction <br />Storm Water Run Off Plan or installation/maintenance <br />Removal of common perimeter fencing <br />Patchwork or repair work <br />Second mobilization for each piece of equipment <br /> <br />Ferma Corporation proposes to perform the above-described work for as follows: <br /> <br />Item No.1 - Outside of the Fence $ 8,230.00 <br /> <br />Item No.2-Inside of the Fence $17,180.00 <br /> <br />Total bid price: $ 26,010.00 <br /> <br />Pro;ect Schedule: <br />Ten work days <br /> <br />Pavment Schedule: <br />Payments on account shall be due and payable within twenty (20) days after the date of the invoice for all <br />acceptable work completed each month (no retention). <br /> <br />Qualifications: <br />· Notificat~on of utility companies regarding disconnect of service and meter by others <br />Site shall be left rough graded with all concrete, masonry, asphalt, debris, roots, etc. in excess of 3" cross- <br />section removed <br />Stand-by time may be incurred for sitting machines if work stoppage occurs due to non-Ferma related <br />causes. <br />Additional mobilization, if required, will be charged at $2,500.00 each occurrence <br />Ferma Corporation excludes "All Risk!Builder's Risk" insurance coverage <br />Indemnity and hold harmless clauses to be mutually agreed upon <br />Ferma Corporation meets/exceeds State of California recycling requirements <br /> <br />Please do not hesitate to call our office if you have any questions. <br /> <br />Sincerely, <br /> <br />Fenna Corporation <br /> <br />~~ <br /> <br />MF:rrl <br />