My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Covello Group, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Covello Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2010 1:44:28 PM
Creation date
4/30/2010 1:44:26 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Covello Group, Inc.
PROJECT NAME
Construction Management Services Pump Station No. 12
RMP File Number
304.5
Date
4/29/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Attachment 2 <br /> <br />Construction Management Services <br />Pump Staton No. 12 <br /> <br />a. In the event that the Contractor encounters a time sensitive <br />problem where it is not practical to take time to negotiate a <br />settlement, the CM will issue a FO. All work done under a <br />FO will be completed on a time and material basis. The <br />CM and the City of Redwood City will execute the FO. <br />b. Field Directives will be issued to the Contractor when the <br />directed work is to proceed under protest. <br />8. Progress Payments <br />a. Administrate the preparation and processing of the monthly <br />progress payments. <br />9. Scheduling <br />a. Review and work with the Contractor in their development <br />of the initial baseline schedule and preparation of the <br />weekly updates. <br />b. Provide written comments to the Contractor on the <br />baseline and weekly update schedules. <br /> <br />II. Field Inspector (FI): Jonathan Cowsert <br />A. Project Responsibilities <br />1. Field Observation (When on-site) <br />a. Provide field observation services to monitor compliance <br />with Contract Documents. <br />b. Prepare a daily inspection report documenting all field <br />activities, field crews, Contractor equipment, and field <br />problems. <br />c. Submit all daily inspection reports to the CM and the City. <br />d. Coordinate with the CM to maintain the database, <br />implemented by Covello, for daily observation reports and <br />photographs. <br />e. Provide photographic documentation of the project prior to <br />construction, and maintain photographs of field activities <br />for status monitoring of the project. <br /> <br />III. <br /> <br />Special Inspections, Testing <br />A. Schedule and coordinate special inspections, materials testing. <br />B. Redwood City will contract for all special services including: <br />a. Hazardous materials inspections, testing or consultations. <br />b. Concrete quality control and testing <br />c. Soils testing <br />d. Geotechnical services <br />C. Redwood City will contract for all other design related services. <br /> <br />~ <br /> <br />III. Project Closeout <br />A. The Contractor will furnish record documents, which Covello will turn over <br />to Redwood City. <br /> <br />C. Final Inspection and Punch List <br />1. Redwood City will participate and provide input on final <br />inspection. <br /> <br />March 29,2010 <br /> <br />Page 2 of3 <br /> <br />i .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.