Laserfiche WebLink
<br />PERMIT NO. 6-94 <br />(Issued on July 24, 1996, As <br />Amended Through March 4, 2010) <br />AMENDMENT NO. SIX <br />(Exclusive of Amendment No. Four) <br />City of Redwood City and <br />Keech Properties, LLC <br />Page 17 <br /> <br />assure that the marsh is restored. As conditioned, the Commission finds that the fill <br />authorized in Amendment No. Six outweighs the detriments of the fill, that the fill is <br />minor in nature and the minimum amount necessary for the purpose of the project, <br />and no feasible upland alternative exists. <br /> <br />C. Public Access <br /> <br />1. Closure of Existing Public Access Use of Levee. The acquisition of fee title and <br />easements to the levees encompassing Redwood Shores for the expressed purpose of <br />providing public access was a major benefit obtained by the State in its title <br />settlement with Redwood Shores (the original co-permittee) in 1974. Since the <br />settlement, the levees have been used by hikers, joggers, bicyclists, dog walkers, etc., <br />who enjoy superb views of marshlands, the Bay, San Bruno Mountain, the San <br />Francisco skyline, and the south Bay. <br /> <br />Initially, the City of Redwood City planned to raise the elevation of the levees and <br />maintain existing levee access. However, during informal, and later formal <br />discussions with USFWS under Section 7 of the Endangered Species Act, and the <br />manager of the San Francisco Bay National Wildlife Refuge, which borders the <br />northern project levees, the USFWS expressed serious concerns regarding the <br />project's potential cumulative impacts to the endangered California Clapper Rail and <br />the Salt Marsh Harvest Mouse. USFWS stated that the strengthened levees would <br />not only protect existing development but would also allow future development <br />which would lead to increased human disturbance, increased predator pressure, a <br />reduction in the ability to control predators, and habitat loss that would jeopardize <br />the continued existence of these two endangered species in the tidal marshes <br />outboard of the project levees. <br /> <br />As a result of USFWS's recommendations, the permittees substantially modified <br />their project. The revised project closes approximately 2.2 miles of the levee to public <br />access after reconstruction of the levees. An alternative inland access trail has been <br />designed that would be continuous, would border diked baylands which provide an <br />open space experience of seasonal wetland habitat, and would provide point access <br />to locations with good views of the Bay. The alternative inland access would be <br />enhanced with various public access amenities such as observation decks, <br />landscaping, and paved access paths. Despite the designer's best efforts, the <br />alternative route would not provide as desirable a public access experience as <br />currently exists on the levees. The inland route cannot match views of the Bay, tidal <br />marshes, and a sense of open space and wildness afforded by the outboard levee. <br /> <br />The permittees do not argue that the alternative inland access route is as desirable as <br />the existing levee trail. However, the permittees feel certain that if they insist on <br />continuing public access use of the rebuilt levees, the USFWS will issue a jeopardy <br />opinion based on Section 7 of the Endangered Species Act and the levee <br />reconstruction project will be blocked or held up for years with no certain outcome. <br />The permittees offered the alternative inland access as a means of avoiding issuance <br />of a jeopardy opinion and contend that the access described in their proposal is the <br />best that can be provided given the constraints of access at the site required by the <br />