My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2010-040907
RedwoodCity
>
City Clerk
>
Recorded Docs 2010-2012
>
2010
>
RecDoc 2010-040907
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2010 2:43:18 PM
Creation date
4/30/2010 2:43:12 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Amendment
Subject
Permit No. 6-94 Amendment No.6 San Francisco Bay
Doc Num
2010-040907
Rec Date
4/15/2010
Parties
San Francisco Bay Conservation and Development Com
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PERMIT NO. 6-94 <br />(Issued on July 24, 1996, As <br />Amended Through March 4, 2010) <br />AMENDMENT NO. SIX <br />(Exclusive of Amendment No. Four) <br />City of Redwood City and <br />Keech Properties, LLC <br />Page 22 <br /> <br />The Bay Plan recognizes that public access should be developed around particular <br />site conditions, including existing wildlife resources. Earlier discussions with <br />USFWS indicated that it could support a 300-foot-Iong spur trail along the <br />southwestern end of levee segment VII. However, the primary reason for limiting <br />public access in this area appears to be for carrying out predator control activities, <br />there does not appear to be evidence that this area is used by either the endangered <br />rail or harvest mouse, although the area adjoining the levee appears to be suitable <br />habitat for both species. The Commission's Design Review Board, at its July 8, 1996 <br />meeting, strongly recommended that access be returned to the rebuilt levee as much <br />as possible. Because the 6,200 feet of levee segments VI and VII are shown as a park <br />priority use area, and because the outboard tidal marshes in this location are the <br />smallest of any at the tip of the Redwood Shores peninsula and thus are likely to <br />support few if any endangered species, keeping approximately 15% of this levee <br />open to public access seems the minlmum needed to assure consistency with the <br />Commission's park priority use area. By this authorization, the Commission again <br />reluctantly finds that by providing public parking for 12 vehicles at the southern end <br />of levee segment VII, extending the public access path 900 feet along the <br />southwestern end of levee segment VII, and reviewing the public access restrictions <br />and alternative inland access areas every three years to determine if revisions to the <br />levee access restrictions or inland access are warranted, the project is consistent with <br />Bay Plan park priority use designations. <br /> <br />Amendment No. Six does not alter the present or possible future public access <br />within the proiect area identified in Bay Plan Map No.6 as a Waterfront Park/ Beach <br />Priority Land Use Area. The amended permit continues to require the periodic <br />evaluation of whether it is still necessary to close off portions of the levee to protect <br />the endangered species living in the area. <br /> <br />4. Timing of Opening Relocated Public Access/Public Access Restriction. To assure that <br />there will be minimal interruption in the public's ability to use access along the <br />Bayfront, the timing of closing existing levee access, constructing the levee <br />improvements, and opening the inland trail route must be carefully coordinated. The <br />permittees stated that "public access restrictions will be implemented after <br />completion of construction on the exterior levees and prior to the occupancy of Lido <br />Parcels 1 and 2. The alternative public access improvements described in the Public <br />Access and Mitigation Plan should be completed prior to implementing the public <br />access restrictions". The permittees proposed that access on the rebuilt levee would <br />not be closed until an acceptable alternative route has been provided, and that the <br />inland route would have to be completed before any residence could be occupied at <br />Lido Parcels 1 and 2. The permittees submitted a detailed outline for the phasing and <br />implementation of each segment of the alternative access route which is designed to <br />ensure that the alternative route is completed prior to implementing restrictions on <br />the exterior levees. <br /> <br />The Commission's permits typically include conditions requiring that public access <br />areas be restricted for public access use prior to any construction on the project and <br />that required public access improvements be completed prior to use of any <br />
The URL can be used to link to this page
Your browser does not support the video tag.