Laserfiche WebLink
Park St/Linden Street P1-55 SFPUC Engineering July, 2009 STA 268+70 <br />Management Bureau <br />Linden Park P1-55 SFPUC Engineering July, 2009 STA 269+00 to <br />Management Bureau STA 270+90 <br />Center St/Madrone Street P1-56 SFPUC Engineering July, 2009 STA 272+75 <br />Management Bureau <br />McEvoy Street P1-56 SFPUC Engineering July, 2009 STA 276+00 <br />Management Bureau <br />Fleishman Park P1-569 P1-57 SFPUC Engineering July, 2009 STA 276+30 to <br />Management Bureau STA 277+75 <br />Locust Street P1-57 SFPUC Engineering July, 2009 STA 278+40 <br />Management Bureau <br />Hemlock Avenue P1-57 SFPUC Engineering July, 2009 STA 280+65 <br />Management Bureau <br />Woodside Road PI -58 SFPUC Engineering July, 2009 STA 283+00 <br />Management Bureau <br />1491 Hess Road P1-60 SFPUC Engineering July, 2009 STA 292+80 <br />Management Bureau <br />Contractor shall maintain emergency access and place Road Closed <br />Ahead signs at each end of the block during work hours. Pipeline <br />installation shall occur between 7:30AM to 4:30PM, M -F, when the <br />road may be closed. Any affected areas of paving and sidewalks <br />shall be restored per Redwood City standards. <br />Contractor shall not be required to rebuild this park after <br />completion of pipeline installation. Disturbed area shall be <br />restored to be leveled, clean and clear of all debris and loose soil. <br />Site shall be rough graded to match existing condition or better. <br />Only one of these two streets may be closed at any given time, <br />provided the other street is maintained with at least one reversible <br />open lane at all times during such closure. Madrone may be fully <br />closed only between 7:30AM to 4:30PM, M -F. Center St. may be <br />fully closed only between 9:OOAM to 4:OOPM, M -F. Two lanes on <br />both streets shall remain open during non -work hours. Affected <br />areas of paving and sidewalks shall be restored per Redwood City <br />standards. CCSF's Contractor shall conduct closed circuit <br />television (CCTV) inspection of a 6 -inch existing sewer pipe which <br />crosses the new proposed pipeline in Center Street. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />sidewalks shall be restored per Redwood City standards. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of a 6 -inch existing sewer pipe which crosses the new <br />proposed pipeline in McEvoy Street. <br />CCSF's Contractor shall restore any affected areas of Fleishman <br />Park, including new Water Feature, paving, irrigation and <br />landscaping per the existing Fleishman Park drawings attached to <br />Project drawings. <br />CCSF's Contractor shall allow access to residence at 150 Locust <br />Street and 127 Locust Street during non -work hours, and <br />emergency access during work hours. Any affected areas of paving <br />and sidewalks shall be restored per Redwood City standards. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of a 6 -inch existing sewer pipe which crosses the new <br />proposed pipeline in Locust. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />sidewalks shall be restored per Redwood City standards. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of a 6 -inch existing sewer pipes which crosses the new <br />proposed pipeline in Hemlock Avenue. <br />Trenchless crossing. <br />CCSF's Contractor shall allow access to 1491 Hess Rd during non - <br />work hours, and emergency access during work hours. <br />R <br />B- <br />edwood City MOA 100318 PD JLO RH FINAL DOC° "a.Citya �:.NIOA100309 nn n n ov nnC <br />