PROJECT NAME
Bay Division Pipeline No. 5 Project
RMP File Number
304
Date
3/30/2010
Reso Ref
14996
MO Ref
10-015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B (continued) <br />II. REDWOOD CITY SEWER PROTECTION AND REPLACEMENT REOUiREMENTS <br />1. Before and after Project construction, the Contractor shall conduct closed circuit television (CCTV) of the existing <br />sanitary sewer mains at each location, where the proposed pipeline will cross such sewer mains, from the closest <br />upstream manhole to the closest downstream manhole. Contractor shall submit the videos and inspection reports to <br />Redwood City for review. Any defects found in the post inspection videos shall be repaired at the Contractor's <br />expense. <br />2. Contractor shall protect and support all existing sanitary sewer pipelines at each location where they are crossed by the <br />proposed pipeline. If any deflection or damage to the sewer pipeline is detected, Contractor shall immediately <br />implement the bypass pumping plan and repair the defect. <br />3. When working underneath City's sewer pipelines, Contractor shall have three (3) stand-by portable pumps and (300' - <br />400') long flexible hoses in different sizes (2" to 4" in diameter). This emergency pumping system should be capable <br />of relieving large build-ups of sewage in sewer mains. <br />4. CCTV monitoring shall occur during low flow periods, 9:OOAM to 12:OOPM and 3:OOPM to 5:OOPM. <br />5. The Contractor shall not stop or impede the sewer main flows under any circumstances. In case of a pipe break, the <br />sewage flows shall be conveyed safely around the work area in a manner that will not cause surcharging of sewers, <br />damage to sewers, and that will protect public and private property from damage and flooding, including the routing of <br />sewage overflow in the event of failure of any bypass system. <br />6. The Contractor shall protect water resources, wetlands, and other natural resources from sewer overflows. <br />7. The Contractor shall replace the existing sanitary sewer pipeline damaged during the construction with the same size <br />Polyvinyl Chloride (PVC) pipe. Mission bell or approved couplings shall be used to connect the existing and new PVC <br />pipeline. <br />III. REDWOOD CITY WATER MAINS PROTECTION AND REPLACEMENT REOUIREMENTS <br />1. SFPUC Contractor shall protect Redwood City's water mains at each location where they are crossed by the proposed <br />pipeline. Should any portion of the existing water main be damaged by activities related to the construction of the <br />BDPL #5, the section of pipe shall be replaced immediately. Old cast iron pipes (CIP) are the most vulnerable and <br />represent a risk of breakage during construction, resulting in disruption of service and more costly replacement. <br />Therefore, these mains require to be secured by replacing a length of pipe to extend at least to the first joint passing the <br />trench edges of the new pipe; or further, if needed. See table below for detail. <br />2. The cast iron water mains that require field evaluations and replacements as described herein are listed by station and <br />street name. All other mains, not listed in table below or found in the field, including PVC and other materials, shall be <br />braced and secured during construction. <br />3. Replacement of these sections of CIP water mains shall be performed using C-900 Class 200 PVC pipe in conformance <br />with Redwood City Engineering Standards — Section 02660 — "Water Systems" and the City Standard Details. The <br />pipe couplings used to connect the new pipe section to the existing main shall comply with these specifications. The <br />coupling sleeves shall be at least twelve (12) inch long. Pipe trench shall be backfilled per Standard Detail UT -1 or <br />using CDF to meet compaction requirement, as applicable. <br />4. The Contractor shall coordinate with Redwood City's Inspector, and Public Works Services Department to schedule <br />water shut down; allowing plenty of time for notification and planning. <br />5. The Contractor shall conduct the following chlorination procedure to disinfect the new pipe and fittings used to replace <br />any portion of Redwood City water mains. This procedure shall be conducted the same day as the pipe and fittings are <br />to be installed. <br />6. Prior to installation and connection to the existing water system, a chlorine solution of 200-mg/L available chlorine <br />shall be applied directly to the inside of pipes and inside and outer surfaces of fittings. The chlorine solution shall be <br />applied with suitable brushes or spray equipment and thoroughly coat all surfaces to be treated. <br />7. The disinfected surfaces shall remain in contact with the chlorine solution for at least 30 minutes and be covered and <br />protected all around using clean polyethylene bags. Following this procedure, and subject to satisfactory inspection by <br />the City Inspector, the pipe and fittings can be installed to the existing distribution system using gloves and proper <br />handling to prevent dirt or contaminants from contacting the inner surfaces through the installation process. <br />8. The area of existing pipeline which the new stretch of pipe is to be connected shall be swabbed with chlorine solution <br />mentioned above. <br />9. After the pipe and fittings are installed, the Contractor shall safely flush the water system using the nearest available <br />downstream hydrant until the chlorine measurements show that the concentration in the water leaving the main is no <br />higher than it is in the distribution system or acceptable for domestic use. A minimum flushing time of 15 minutes <br />shall be provided <br />10. A neutralizing dechlorination chemical shall be applied to the water to be wasted to thoroughly neutralize the residual <br />chlorine. The product used for this purpose shall be Bio -Neutralizer, with 35% concentration Sodium Sulfite <br />dechlorination tablets as produced by NORWECO, or approved equal. <br />11. The Contractor shall protect storm drains, water streams, wetlands, and other natural resources from chlorinated water. <br />IV. PROTECTION AND REPLACEMENT OF EXISTING CAST IRON WATERMAINS <br />AT PROPOSED BDPL #5 CROSSINGS <br />With respect to the existing cast-iron water mains owned by Redwood City located within the CCSF right-of-way and at the <br />street -crossing locations listed below, Contractor shall: <br />• In coordination with City Engineer, expose pipes within CCSF right-of-way sufficiently to allow pipe condition to be <br />assessed in place before 60" -pipe trench excavation. City shall make a good faith effort to provide its representative to <br />City of Redwood City MOA ver 030910 <br />