Laserfiche WebLink
<br />The EDCCO Group, Inc. <br />En9neering and Control Solutions <br /> <br />P.O. Box411 <br />195 Glenn Way, Suite 100 <br />San Carlos, Calif. 94070 <br />email: info@EDCCO.Com <br /> <br />Phone (65063-SCADA <br />Phone (650) 364-6683 <br />FAX (650) 649-2328 <br /> <br />Mr. Phong Du <br />The City of Redwood City <br />Engineering and Construction <br />1017 Middlefield Road <br />Redwood City, CA 94063 <br /> <br />VIA email <br /> <br />March 30,2010 <br /> <br />SUBJECT: <br /> <br />Distribution Pump Station <br />Engineering Assistance for Phase 2 Expansion <br /> <br />Q1091 0070027 <br />Revision 4 <br /> <br />Phong, <br /> <br />This quotation combines our two previous proposals for <br /> <br />1. Design assistance, construction support, and testing for the Phase 2 expansion of the <br />Recycled Water Distribution Pump Station under design by Kennedy/Jenks Engineers <br /> <br />2. PLC, HMI, and SCADA programming, start-up, and tuning for the Phase 2 expansion of <br />the Recycled Water Distribution Pump Station. <br /> <br />SCHEDULE OF TASKS AND DELlVERABLES: <br />Schedules "A" and "B" are attached <br />The following specific project descriptions are noted "(1)" and "(2)" as they relate to the above <br />items: <br /> <br />PROPOSED PROJECT (1) <br /> <br />· Expansion of Distribution Pump Station to add 2-5 main pumps and associated <br />equipment, instrumentation, and programming as follows: <br />· Participate in evaluation of present design, installation, and operational data <br />· Participate in design of additions to facility and changes to operations to mitigate <br />existing problems and achieve project goals <br />. Support the design team with information and ideas using best-value <br />engineering, <br />· Provide the level of detail and expandability to accommodate the full integration <br />of the facilities under design <br />· Coordinate work underway with present controls and SCADA system for a <br />seamless integration <br /> <br />ESTABLISH PROJECT MANAGEMENT METHODS (1) <br />· This project will be coordinated through Redwood City's Engineering and Construction <br />Division, Public Works Operations, Construction Management, and Kennedy Jenks <br />Engineers. <br />o We will respond directly to requests from parties and cc/notify other parties as <br />appropriate for the situation (based upon experience with the existing project) <br />