My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Hauge Brueck Associates, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Hauge Brueck Associates, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2011 8:33:48 AM
Creation date
6/1/2010 2:26:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Hauge Brueck Associates, LLC
PROJECT NAME
Environmental Consulting Services for the Saltworks Develpoment Proposal
RMP File Number
304
Date
6/1/2010
MO Ref
10-094,10-165, 11-069
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 3 Identification of Agencies and Experts <br /> 3.1 NEPA and CEQA Strategies <br /> The ECT shall participate with the ERMT in identifying the appropriate NEPA lead agency and <br /> responsible NEPA and CEQA agencies. The ECT shall participate with the ERMT in identifying CEQA <br /> documentation strategies. Once the NEPA lead agency is identified the NEPA documentation strategy <br /> shall be developed. <br /> 3.2 Identification of Technical Experts <br /> Based on the development of the environmental section outlines in Task 4 and results of the scoping <br /> meetings, the ERMT with ECT participation shall assemble a list of expert resources to be considered for <br /> inclusion on the ECT. <br /> Task 4 Environmental Table of Contents and Sections_ <br /> The u ose of this task is t <br /> p rp to capture and record appropriate information to be used in the subsequent <br /> phases of the project. The Table of Contents of the identified sections shall be peer reviewed for <br /> adequacy for inclusion in the EIR. Peer review of available technical reports provided by the Applicant <br /> will be conducted. <br /> 4.1 Project Description Outline <br /> The ECT shall maintain an outline of the Project Description. The Project Description is to include but <br /> not be limited to land ownership, dimensions of facilities, acreage, descriptions of facilities, staging areas, <br /> phasing, population, employment, construction practices, operations, sustainability practices, public <br /> services to be provided and utility and transportation improvements. <br /> 4.2 Project Objectives, Purpose, and Need Outline <br /> The City shall provide the ECT with sections of the General Plan that identify the City's objectives, <br /> purpose, and need. The Applicant shall provide their statement of objectives, purpose, and need. Using <br /> the provided documents, the ECT shall revise the draft outline of the Project Objectives, Purpose, and <br /> Need. <br /> 4.3 Affected Environments and Study Area Outline <br /> The City and Applicant shall provide the ECT with relevant technical studies, reports, and graphics <br /> related to the potential study area of the Project. The ECT shall review the documents to identify the <br /> affected environmental areas, potential study area, and data gaps. <br /> 4.4 Mapping of Study Area <br /> The ECT shall assemble available mapping of the affected resources using the studies, reports, and <br /> graphics provided by the City and Applicant. <br /> 4.5 Track Project Alternatives <br /> The ECT shall maintain a Project Alternatives Outline to track potential alternatives. <br /> Saltworks Environmental Program Task Order No. 004 Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.