My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Ferma Corp
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Ferma Corp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2010 11:40:24 AM
Creation date
6/11/2010 11:38:23 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Ferma Corporation
PROJECT NAME
707 Bradford Demollition Project
Date
6/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of Redwood City <br />707 Bradford Street, Redwood City <br />Demolition Quotation <br /> <br />April 16, 2010 <br />09-0492.R 1 <br />Page 2 <br /> <br />Exclusiolls COlltillued: <br />All permits, fees and/or recycling deposit fee (except BAAQMD) <br />Payment and/or performance bonds - see add altemate #1 <br />Import/exp0l1 soil, baserock, and/or turf (sod/grass) <br />Underground and/or septic tank removal <br />Backfill/compaction (basement, pool, footing, retaining walls) <br />Removal of asphaltic concrete and/or concrete with plastic and/or reinforcing fabric on underside (additional <br />dump fees may apply) <br />Erosion control measures <br />New fences <br /> <br />Fenna Corporation proposes to perfonll the above-described work for a total bid price of: $28,300.00 <br /> <br />Alterllate No.1: Add $408.00 <br />Payment and/or perfonnance bonds <br /> <br />Pro;ect Sclledule: <br />Twenty (20) working days <br /> <br />Pavmelll Schedule: <br />Payments on account shall be due and payable within twenty (20) days after the date of the invoice at the rate of <br />90% of all acceptable work completed each month. Retention is due and payable within sixty (60) days of the <br />completion of our portion of the work. Interest will be charged at the rate of 1.5% per month on past due <br />accounts. <br /> <br />Oualificatiolls: <br />· BAAQMD requires that the company that is actually going to perform the demolition work must be listed as <br />the contractor performing the demolition <br />Notification of utility companies regarding disconnect of service and meter by others <br />Site shall be left rough graded with all concrete, masonry, asphalt, debris, roots, etc. in excess of 3" cross- <br />section removed <br />. Stand-by time may be incun-ed for sitting machines if work stoppage occurs due to non-Femla related <br />causes. <br />· Additional mobilization, if required, will be charged at $1,500.00 each occurrence <br />· Ferma Corporation excludes "All Risk/Builder's Risk" insurance coverage <br />. Indemnity and hold harmless clauses to be mutually agreed upon <br />· Proposal valid for 30 days from the date of this proposal <br />Ferma Corporation meets/exceeds State of California recycling requirements <br /> <br />Please do not hesitate to call our office if you have any questions. <br /> <br />Sincerely, <br /> <br />Ferma Corporation <br /> <br />~~ <br /> <br />Tim Ruff <br /> <br />TR:nlm <br />
The URL can be used to link to this page
Your browser does not support the video tag.