Laserfiche WebLink
<br />F. Poles and arms shall be factory painted per city standard. <br /> <br />VI. MEASUREMENT & PAYMENT <br /> <br />1. MOBILIZATION & DEMOLITION <br /> <br />A. Full compensation for all mobilization and demobilization, and demolition measures, <br />including labor, materials, tools, and equipment required as necessary will be paid in <br />the lump sum price for MOBILIZATION AND DEMOLITION <br /> <br />B. Contractor is to protect the existing property and landscaping to the full extent <br />possible. Full compensation for restoring damaged structures, landscaping, and <br />other incidentals related to the completion of the project shall be included in the lump <br />sum price paid for this bid item. <br /> <br />C. Full compensation for all required demolition work, traffic control, inclusive of area <br />separation, dust barriers, debris off-hauling, general site cleanup and preparation for <br />specified improvements, as shown and noted, shall be included in this bid item. <br /> <br />2. LED LIGHT <br /> <br />A. Full compensation will be paid for providing all the required work done at the contract <br />lump sum price for the LED Light under this bid item. <br /> <br />B. Work shall be inclusive of all preparatory work for the installation of the required work <br />for the LED lighting fixture, pole, wires, and appurtenances. This shall be inclusive of <br />the work required for furnishing and installing the new pole on the existing <br />foundation, verifying the bolt circle, LED lighting fixture, wiring, and all associated <br />work as shown and noted on the contract drawings. <br /> <br />5 <br />