My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 A&F Engineering, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 A&F Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2010 12:49:15 PM
Creation date
6/15/2010 2:05:59 PM
Metadata
Fields
Template:
Agreement
Contractor Name
A & F Engineering, Inc.
PROJECT NAME
Veterans Senion Center Parking Lot LED Light Standard Project
RMP File Number
304.5
Date
6/14/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />F. Poles and arms shall be factory painted per city standard. <br /> <br />VI. MEASUREMENT & PAYMENT <br /> <br />1. MOBILIZATION & DEMOLITION <br /> <br />A. Full compensation for all mobilization and demobilization, and demolition measures, <br />including labor, materials, tools, and equipment required as necessary will be paid in <br />the lump sum price for MOBILIZATION AND DEMOLITION <br /> <br />B. Contractor is to protect the existing property and landscaping to the full extent <br />possible. Full compensation for restoring damaged structures, landscaping, and <br />other incidentals related to the completion of the project shall be included in the lump <br />sum price paid for this bid item. <br /> <br />C. Full compensation for all required demolition work, traffic control, inclusive of area <br />separation, dust barriers, debris off-hauling, general site cleanup and preparation for <br />specified improvements, as shown and noted, shall be included in this bid item. <br /> <br />2. LED LIGHT <br /> <br />A. Full compensation will be paid for providing all the required work done at the contract <br />lump sum price for the LED Light under this bid item. <br /> <br />B. Work shall be inclusive of all preparatory work for the installation of the required work <br />for the LED lighting fixture, pole, wires, and appurtenances. This shall be inclusive of <br />the work required for furnishing and installing the new pole on the existing <br />foundation, verifying the bolt circle, LED lighting fixture, wiring, and all associated <br />work as shown and noted on the contract drawings. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.