Laserfiche WebLink
<br />I . <br /> <br />2. ENTRY MODIFICATIONS <br />A. Full compensation will be paid for providing all the required work done at the contract lump <br />sum price for the new door, gate assemblies, and electrical modifications under this bid item. <br /> <br />B. Work shall be inclusive of all preparatory work for the installation of the required work for the <br />entry modifications. This shall be inclusive of the work required for furnishing and installing <br />the new door assembly, hardware, all associated electrical work for the electrical door <br />hardware, and coordination with the City's third party hardware vendor. This item shall also <br />be inclusive of the required work for furnishing and installing the new gate assembly, <br />hardware, all of its associated electrical work, and coordination with the City's third party <br />hardware vendor, for the new gate assembly, as called for in the documents. <br /> <br />3. MODIFICATIONS, GLAZING, PAINTING, FINISHES <br /> <br />A. Full compensation will be paid for providing all the required work done at the contract lump <br />sum price for the required modifications, glazing, painting, and finishes. <br />B. Under this bid item, all work for the modifications required for the installation of the glazing at <br />the existing counter, as shown and noted, shall be provided. This shall be inclusive of the <br />required blocking, posts, openings in glazing, tinting, and all noted hardware and <br />appurtenances that are associated with this work. The painting and finishes for this are as <br />also included under this bid item. This work shall be inclusive of painting the entire wall <br />where the new door is being installed on both sides. The entire back wall of the enclosed <br />counter area shall be painted. The office area wall affected by the installation 'shall also be <br />painted. The City will provide the Kelly Moore paint numbers to be used I provided by the <br />Contractor. In addition, also under this bid item, the contractor shall furnish and install vinyl <br />floor tile, for patching the floor area, where the new door assembly was installed. <br /> <br />5 <br />