Laserfiche WebLink
<br />I ' <br /> <br />iii <br />- <br />III!I <br />U <br />.. <br />III. <br />l'1li9 <br /> <br />aIBiII liB IIIl <br />.. 1111 <br />iii. <br />1m _. <br />.._ fI <br />. .... <br /> <br />1JiiI__ III <br />- III .. .. II- <br />!!;I I -. 11111- <br />I!iII! II II II .- <br />- . <br />III <br />.. II JI <br />..Ia... I 1& <br />-- <br /> <br />l1li · IiIiI .. _... i..... III <br />I" .. . -.. . ..111 I <br />iI I:l tI nI ~ IJ .. I . III I Ii~ <br />.. ... . -.!. - -- . <br />.. I!i!I .. II1II _1111 .l1li11" _.. <br />....-1IlI ....... . IlIIlB _III. <br /> <br />IBIlIIIlIIiBIII <br />__.11111 ---I <br />II · _.11 . <br />III. II.. I_ .-Irr . <br />.: .. II iIIlI!I .... . . <br />... · II" iIrI... I II <br />.. ... -- -. .-. <br /> <br />ill <br /> <br />Mr. BriallLee <br /> <br />Page 3 pf4 <br /> <br />412112010 <br /> <br />C) Consh'uction Documents <br />Th~ C~))lstn1ction Documents will JncOl])Ol'ste comments from the 100% submlttall'eview and <br />include preparation of the fmal PS&E docm~ellts fOl' putting the project out to bid. <br /> <br />Del/vel'ables: <br /> <br />)> One (1) fbll-size reproducible set of the Fiual Construction Plans (Signed) <br />)> One (1) half-size set of the Final COl\stmcti91l Plans (Signed) <br />> One (1) set of the Final Project Specifications <br />> One (1) copy ofth~ Final Construction Cost Estimate <br />> A digital copy of the fmal Speoificatip,ns and Contract Documents in .PpF fOl1nat and R <br />digital copy of the drawings in CAD 01' PDP format <br /> <br />The estimated blldgetfor this work is $20,000. <br /> <br />3) Design SUll)lol't Dm'lug Constl'uctlon <br />'York performed under this task would include providing supplemental support to the City for <br />construction inquiries, Om fee only includes a nomhlal amount of support at this time, <br />consisting of attendance at one Constl'uction Kickoff nieeting and up to foul' haUl'S of City- <br />schedliled meetings. The Co~struotion Support phase wll1 include the following items: <br /> <br />o Review alld prepare response to RFIs <br />o Review Contractor Submittals and shop drawings for compatibility with design <br /> <br />The estimated budgetfor this work is 34,000. <br /> <br />worn{ !'fOT INCLUDED IN PROPOSED DESIGN SERVICES <br /> <br />The following work is NOT included hl this proposal: <br /> <br />o Utility calculations (watel', sewer, drainage, etc.), <br />, Lot lines and street Right of\Vay surveys, <br />o Environmental Clearance Study 01' Analysis) <br /> <br />SERVICES AND FEE <br /> <br />All work would be pelformed Qlid billed OJI a time alld materials b,asls based 011 actllal houl's wOlted <br />to complete the tasks ,'eqllested. The attached Fee Estimate Breakdown provides all estimate oj how <br />time would be spellt 011 this work. <br /> <br />Since tile Qrigi1lal contract ($10,900) 1$ sllll active with app,'oxlmately $5,500 remallllllg.this amoullt <br />will be deducted from the $29,100 (i.e. $29,100 .. $5,~OO =, $23,600) pel' ihe City's request, The <br />difference 01$23,600 would be the amollnt to complete the tasks olltlined above. <br />