My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Mark Thomas & Company, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Mark Thomas & Company, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2010 2:32:52 PM
Creation date
6/18/2010 2:31:36 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Mark Thomas & Company, Inc.
PROJECT NAME
Redwood Shores Lagoon Maintenance Boat Ramp Extra Work #1
RMP File Number
304.5
Date
6/15/2010
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Mr, Brian Lee <br /> <br />Page 2 of4 <br /> <br />412112010 <br /> <br />Dellverables: <br /> <br />)> Field survey points file and tope map for the pl'Oject area. <br /> <br />The estimated budge/fo/' this work;s $5,100. <br /> <br />2) Design Plan~J Specitlcat,loJls a11(1 Cost Estimate <br />MTCo will \Vol:k with the CIl)' and the City;s harvesthlg contractor to de~lgll a ~oat ramp for <br />maintel\811Ce access to the lagoo11 for harvesting the widgeon weed and other algae foi'Jns that <br />infest the lagoon d\lring sul'llmer lUo~ths" Th~ desJgn would include modifYing and extending <br />the decorative, metal railing at Shannon Park aroUllo the boat ramp tQ discourage pnb.Hc use of <br />the ramp. The desIgn would include a lockable decorative gate to match the railing. Design <br />wOlJld include an 80% and 100% submittal for City review and final Construction D9CU~l\e~~t~ <br />as follows: <br /> <br />A) Pl'elhllh1R1'Y De$lgn (80% PS&E) <br />o One meeting witb City and Cityts harvestor contractor to review pl'elhnln81Y plans <br />o Title Sheet <br />o Layout and Grading plan <br />, Constl'Uctioll details <br />o Staging Plans (coff~l'dam) <br />o Dra~ te~l111ical specifications <br />o Preliminary cOllstruction cost estimate <br /> <br />De/iver(lbles: <br /> <br />~ Three (3) balf-slze ~~ts oftl~e ~O% Plans (11 uxl ?U) <br />)> Three (3) copies of1he Technical Specifications <br />)> Three (3) copies of the preliminary ConstmctiOli Cost Estimate <br /> <br />B) Final neslgll (100% PS&E) <br /> <br />The 100% PS&E will incorporate C'ommen.s from the 80% ~\lbmittal r~vi~w, The 100% <br />PS&E will be revised to add the required detail and design hlforlnatlon. At this point, tbe draft <br />boilerplate wili be adde~ to ~he 100% Teclmlcal Specifications and the complete <br />Specifications will be fully edited to the specific project requirements, The pl'etiminalY cost <br />estimate will be updated based on the 100% plans and specifications. <br /> <br />De/lverables: <br /> <br />)> TJuee (3) review sets of the 100% PS&E <br />
The URL can be used to link to this page
Your browser does not support the video tag.